Your path to submission
- Deadline: 5 October at 23:59 — 2 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (64 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to УРБАН ИНЖЕНЕРИНГ ООД.n = 64
- 43% of this buyer's awards went to companies that had already won here before (444 awards since 2017, spread over 141 companies). That is well below the sector norm (71%) — this buyer switches suppliers more often than others.n = 444 awards since 2017
- The median procedure drew 3 bids (387 procedures with a bid count); 29% ended with a single bidder. Sector: median 2 bids.n = 387
- 10% of awards went to companies from abroad (444 awards with a known winner country). Sector average: 0%.n = 444
- The award came in at a median 81% of the estimated value (38 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 38
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Architecture & engineering, 6 contracts went to foreign companies over the last 3 years (of 12,479 recorded awards).
Typical field: median 3 (from 54 awards).
What the buyer is looking for
‘AUTHORAL SURVEILLANCE OF ARTIFICIAL IRREGULARITIES OF THE TERRITORY OF THE MUNICIPALITY OF HUNTERS’ The contract includes author’s supervision for the construction of artificial irregularities – raised pedestrian crossings, speed limiters and other facilities – tailored to the specific locations and regulatory requirements, and the subsequent execution of the construction and installation works (CMP) in accordance with the approved design. The sites are as follows: № Blvd., 1328 O.T. and 1329 O.T., issued with a building permit № 20/19.03.2026, issued with a building permit , 19/19.03.2026, issued with a building permit № 19/19.03.2026, issued with a building permit , 18/19.03.2026, issued with a building permit № 18/19.03.2026, issued with a building permit , 18/19.03.2026, issued with a building permit 18/19.03.2026, issued with a building permit issued with a building permit …
Show full description
… 21/19.03.2026, issued with a building permit issued with a building permit 21/19.03.2026, issued with a building permit issued with a building permit 21/19.03.2026, issued with a building permit issued with a building permit 21/19.03.2026, issued with a building permit issued by the town of Lovech. Author's supervision during the construction is carried out by the designer under the conditions and in the order determined by the ordinance under Art. 169, para. 4 of the Spatial Development Act and all applicable normative acts.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ТИ ЕЙЧ ТИ КОНСУЛТ ЕООД | 18 | 2023–2026 |
| ГЕОЦВЕТ ЕООД | 12 | 2019–2025 |
| БИМ КОНСУЛТИНГ ООД | 10 | 2023–2026 |
| ТЕРМОКОНТРОЛ СЪРВИЗ ЕООД | 10 | 2018–2025 |
| ЕКО ЕАД | 9 | 2017–2026 |
How often this buyer tenders this