Construction of a playground for children aged 3 to 12 years and landscaping of green areas in the immediate vicinity in PI 68134.1106.81 block space of block 12, Razradnika-Konyovitsa residential complex
"Изграждане на детска площадка за деца от 3 до 12г. и облагородяване на зелени площи в непосредствена близост в ПИ 68134.1106.81 блоково пространство на бл.12, ж.к. „Разсадника-Коньовица“
Bulgaria · how to bid here →
Your path to submission
- Deadline: 5 October at 23:59 — 2 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (21 awards, most recently May 2026) — by that rhythm the next award was due around August 2026. The last award went to СОФИНВЕСТ ЕАД.n = 21
- 58% of this buyer's awards went to companies that had already won here before (65 awards since 2021, spread over 28 companies). 42% went to new names.n = 65 awards since 2021
- The median procedure drew just one bid (63 procedures with a bid count); 56% ended with a single bidder. Sector: median 2 bids.n = 63
- 3% of the bids received came from small and medium-sized enterprises (16 procedures with a bid mix). Sector: 17%.n = 16
- Not one of the 65 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 65
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).
Typical field: median 1 (from 21 awards).
What the buyer is looking for
There is a prepared and approved investment project for the site, which is an integral part of the tender documentation. The technical prescriptions and requirements related to the implementation of the construction and installation works are described and framed in the technical specification and the investment project, both in terms of the type and specification of the individual materials used and in terms of the manner and technology of implementation. Therefore, with regard to the technical specifications for the implementation of this site, those indicated in the investment project, the technical specification and the SCC, which are part of this documentation, should be used.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| СОФИНВЕСТ ЕАД | 21 | 2022–2026 |
| Тръст Билд Про ЕООД | 6 | 2025 |
| СТРОЙКОНТРОЛ 99 ЕООД | 4 | 2025 |
| Кодас Консултинг ЕООД | 3 | 2026 |
| КРИЕЙТ ЛЕВЪЛ ЕООД | 3 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.