Friedrich & ClementBETA

Selection of a Contractor for the Performance of Construction and Installation Works on the Object: "RECONSTRUCTION OF INTERNAL WATER SUPPLY NETWORK AND IMPROVEMENT OF STREET "PLISKA" FROM P.P.529 TO P.P.534 ACCORDING TO THE REGULATION PLAN OF RAKITOVO CITY, RAKITOVO MUNICIPALITY", STAGE 2 - "IMPROVEMENT OF STREET "PLISKA" FROM P.P.529 TO P.P.534 ACCORDING TO THE REGULATION PLAN OF RAKITOVO CITY"

Избор на изпълнител за изпълнение на СМР на обект: „РЕКОНСТРУКЦИЯ НА ВЪТРЕШНА ВОДОПРОВОДНА МРЕЖА И БЛАГОУСТРОЯВАНЕ НА УЛИЦА "ПЛИСКА" OT O.T.529 ДO O.T.534 ПО РЕГУЛАЦИОННИЯ ПЛАН НА ГР. РАКИТОВО, ОБЩИНА РАКИТОВО”, ЕТАП 2 - „БЛАГОУСТРОЯВАНЕ НА УЛИЦА "ПЛИСКА" OT O.T.529 ДO O.T.534 ПО РЕГУЛАЦИОННИЯ ПЛАН НА ГР. РАКИТОВО”

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 14 October at 23:59 — 11 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (39 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to ПРОФЕСИОНАЛ-777 ЕООД.n = 39
  • 61% of this buyer's awards went to companies that had already won here before (136 awards since 2018, spread over 49 companies). 39% went to new names.n = 136 awards since 2018
  • The median procedure drew 2 bids (133 procedures with a bid count); 39% ended with a single bidder. Sector: median 2 bids.n = 133
  • 0% of the bids received came from small and medium-sized enterprises (27 procedures with a bid mix). Sector: 17%.n = 27
  • The award came in at a median 99% of the estimated value (21 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 98%.n = 21

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.

Clement
When comparable contracts were last awarded here, usually just a single offer was on the table — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,077 recorded awards).

Typical field: median 1 (from 38 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Continuation from section Description(BT-24-Procedure):The placing of road signs should start from the furthest road sign before enclosing the area occupied by the construction works, and the removal should be carried out in reverse order according to Ordinance № 3/ 2010. Before the implementation of the construction works, the technical manager of the site should check whether there have been any changes in the normative documents on the basis of which this project has been prepared. If any, it should be reported in a timely manner for completion or possible processing of the site, especially at the time of execution an alarm and marking. All workers to be instructed by the technical manager of the site according to the specific working conditions. During work, workers should wear special signal vests to prevent possible accidents and accidents, in accordance with Article 6 of Ordinance…

Show full description

… № 3 of 16 August 2010. When carrying out construction and installation works to conduct pedestrian traffic, pedestrians should be directed correctly to pass to safe areas in order to ensure safe movement. Ensure safe movement of persons with disabilities. If there is a need to provide access for vehicles with a special mode of movement /fire, ambulance, police, etc./. The areas on which the works will be carried out shall be illuminated at night, according to the project. 5. The tests and measurements of the performed construction and assembly works should be performed by certified laboratories and certified by protocols. It is obligatory to take laboratory samples on the ground and road base before the implementation of the next construction layers. The repair should be carried out in the following order of the CDS: - Excavation for road base, including loading and transportation of landfill; - Excavation for pavement base, including loading and transportation of landfill; - Delivery and laying of NTK 0/63 for road base, incl. profiling and sealing

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerОБЩИНА РАКИТОВО
TypeWorks
Estimated value283.639 €
Published24 September 2026
CategoryConstruction work · CPV 45233252

Who has won here before

CompanyAwardsPeriod
БОЖИЛОВ ЕООД212026
РТ ПРОЕКТ ООД152024–2026
Екоконсулт Пловдив ЕООД122024–2026
Делчев Инженеринг ООД112024–2026
Д2 Строй ЕООД82024–2025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202428
202533
202651

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Wednesday 14 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →