Modernization of recharging machines 5,6PL00E01, type MPS-V-1000-3M-U 4.2
Модернизация на презареждащи машини 5,6PL00E01, тип МПС-В-1000-3М-У 4.2
Bulgaria · how to bid here →
Your path to submission
- Deadline: 26 October at 23:59 — 24 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (89 awards, most recently July 2026) — by that rhythm the next award was due around September 2026. The last award went to СИАНА-ЕЛЕКТРИК ЕООД.n = 89
- 63% of this buyer's awards went to companies that had already won here before (1,610 awards since 2017, spread over 413 companies). That is well below the sector norm (80%) — this buyer switches suppliers more often than others.n = 1,610 awards since 2017
- The median procedure drew just one bid (1,314 procedures with a bid count); 52% ended with a single bidder. Sector: median 3 bids.n = 1,314
- The award came in at a median 95% of the estimated value (207 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 207
- 7% of awards went to companies from abroad (1,610 awards with a known winner country). Sector average: 0%.n = 1,610
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Bulgaria · Electrical machinery, 1 contracts went to foreign companies over the last 3 years (of 2,365 recorded awards).
Typical field: median 2 (from 63 awards).
What the buyer is looking for
The activities covered by the contract include the design, supply, installation and commissioning of rechargeable machine (REM) equipment for each unit, as follows: 1) Preparation of a detailed design (WP) for partial modernization of the MP; The main functions of the modernization project are to gradually replace the corresponding equipment of the mechanical and electrical parts. The project development to be implemented single-phase - phase working project. During the implementation of the project, the Contractor is obliged to provide author's supervision. Work project to be developed separately for 5th and 6th blocks. 2) Supply of equipment/materials and spare parts for PM; For the electrical part, activities and supplies include: • Delivery and replacement of the control system of the rechargers in connection with the production of the resource, according to the technical conditions…
Show full description
… for the control system of the PM; • Supply and replacement of existing cables (power and signal) from cabinets KESZ1 and KESZ1.1 to leak-tight passages, from leak-tight passages to cabinet KSK and removable cables from cabinet KSK to distribution boards of rechargers with a view to natural wear for the given service life and the presence of cables with mechanical damage in the current submarines. • Supply and replacement of KSK cabinet for use of cables qualified for the LOCA conditions between it and the airtight passages; • Delivery and installation of control panels for PM of 5 and 6 EB; • Delivery and replacement of all end switches; • Update of the software for the management of rechargeable machines; • Supply and replacement of sensors and converters of the effort measurement system; • Supply and replacement of all electromechanical relays, power supply units, main and emergency brake control and protection units in HIME, KOSA, FOKA and ROTV cabinets; • Supply and replacement of electromechanical relays and thermal protections for antiseismic protection control in cabinet KESZ1; • Delivery and replacement of all bacon
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| АТОМЕНЕРГОРЕМОНТ АД | 44 | 2018–2026 |
| ЕСКО ИНЖЕНЕРИНГ АД | 30 | 2018–2026 |
| ИПУ-СОФИЯ ЕООД | 29 | 2018–2026 |
| ФИНОКЕМ ООД | 29 | 2021–2026 |
| АДЕН ГРУП ООД | 29 | 2018–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.