Modernization of premises and areas at M/K "VIT"
„МОДЕРНИЗАЦИЯ НА ПОМЕЩЕНИЯ И ЗОНИ НА М/К „ВИТ“
Bulgaria · how to bid here →
Your path to submission
- Deadline: 8 October at 23:59 — 6 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (3 awards, most recently October 2025) — by that rhythm the next award was due around December 2025. The last award went to РИВЪР СЪРВИС ЕООД.n = 3
- 36% of this buyer's awards went to companies that had already won here before (29 awards since 2019, spread over 14 companies). That is well below the sector norm (74%) — this buyer switches suppliers more often than others.n = 29 awards since 2019
- The award came in at a median 97% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 59%.n = 5
- 14% of awards went to companies from abroad (29 awards with a known winner country). Sector average: 0%.n = 29
- The median procedure drew 2 bids (23 procedures with a bid count); 39% ended with a single bidder. Sector: median 1 bids.n = 23
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Repair & maintenance, 12 contracts went to foreign companies over the last 3 years (of 6,154 recorded awards).
Typical field: median 1 (from 5,104 awards).
What the buyer is looking for
The subject of this contract is the modernisation of premises and areas of Vit m/v, in accordance with the activities set out in the Technical Specification, an integral part of the Documentation.The ship has 16 accommodation places, divided into 2 single-seat cabins and 7 two-seat cabins.The Contractor shall carry out all the activities included in the subject of the contract, including the necessary dismantling works, manufacture and/or supply, transport and installation of the new elements, materials and equipment, unless expressly provided otherwise in the Technical Specification or the contract.All costs for the performance of the activities, including the costs of the necessary materials, products, equipment, transport and installation, shall be borne by the Contractor and shall be considered to be included in the price offered by the Contractor. Used, recovered or repaired…
Show full description
… materials, products, equipment and elements shall not be allowed, unless expressly provided otherwise in the Technical Specification or the contract.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ЕВРОПРО КОНСУЛТ ЕООД | 4 | 2025 |
| РИВЪР СЪРВИС ЕООД | 3 | 2024–2025 |
| ЛОМИНИ ООД | 2 | 2024 |
| БАЛКАНТЕЛ ООД | 2 | 2025 |
| Криейтив М груп ЕООД | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.