Friedrich & ClementBETA

Dismantling, delivery, installation and commissioning of 1 (one) water heating boiler in the building of SU "Vasil Levski"

Демонтаж, доставка, монтаж и пускане в експлоатация на 1(един) брой водогреен котел в сградата на СУ "Васил Левски"

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 5 October at 23:59 — 2 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 79% of this buyer's awards went to companies that had already won here before (380 awards since 2018, spread over 81 companies). 21% went to new names.n = 380 awards since 2018
  • The median procedure drew just one bid (252 procedures with a bid count); 80% ended with a single bidder. Sector: median 2 bids.n = 252
  • The award came in at a median 79% of the estimated value (13 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 68%.n = 13
  • 0% of the bids received came from small and medium-sized enterprises (23 procedures with a bid mix). Sector: 16%.n = 23
  • Not one of the 380 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 380

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Bulgaria · Construction materials, 1 contracts went to foreign companies over the last 3 years (of 2,109 recorded awards).

Typical field: median 2 (from 1,783 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the assignment is the dismantling of an existing boiler, the dismantling and preservation for re-use of the existing oil burner and its control electrical panel, the supply and installation of 1 (one) new steel boiler, the adaptation and installation of the existing oil burner to the new boiler, the implementation of the necessary hydraulic, fuel, electrical and flue connections, the adjustment, testing and commissioning of the facility. Delivery of a new burner is not included in the subject of the order.

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerСРЕДНО УЧИЛИЩЕ "ВАСИЛ ЛЕВСКИ"
TypeSupplies
Estimated value23.000 €
Published23 September 2026
CategoryConstruction materials · CPV 44621220

Who has won here before

CompanyAwardsPeriod
ПРОСВЕТА-СОФИЯ АД522021–2026
КЛЕТ БЪЛГАРИЯ ООД412020–2026
ДОМИНО ЕООД292023–2026
ЮНИВЪРС ЕООД222024–2026
АРХИМЕД 2 ООД192024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.
·
days until the deadline — Monday 5 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →