Construction of a parking lot in UPI I-845 "for hospital", block 15, on the territory of Karnobat city - stage 1 and stage 2
„Изграждане на паркинг в УПИ I-845 "за болница", кв. 15, по пл. на гр. Карнобат - етап 1 и етап 2”
Bulgaria · how to bid here →
Your path to submission
- Deadline: 19 October at 23:59 — 16 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Offer and evidence in: BUL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (45 awards, most recently May 2026) — by that rhythm the next award was due around June 2026. The last award went to ПЕ Проект ЕООД.n = 45
- The award came in at a median 58% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 18
- 60% of this buyer's awards went to companies that had already won here before (230 awards since 2017, spread over 74 companies). 40% went to new names.n = 230 awards since 2017
- The median procedure drew 2 bids (199 procedures with a bid count); 40% ended with a single bidder. Sector: median 2 bids.n = 199
- 0% of the bids received came from small and medium-sized enterprises (41 procedures with a bid mix). Sector: 17%.n = 41
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 1 (from 42 awards).
What the buyer is looking for
The subject of this order is a contractor of construction and installation works for the construction of a parking lot for visitors in the northwestern part of the property (REP I-845, sq. 15 according to the plan of Karnobat) with 122 parking spaces, of which 10 for disadvantaged people, as well as an official parking lot with 8 seats opposite the entrance to the hospital. The visitor parking is built in a green area with a completely new asphalt flooring. The adjoining sidewalks will be built with concrete slabs and a garden curb. For the parking lot for visitors is envisaged the construction of an access control system - entrance and exit barriers, entrance and exit devices. Anti-parking pegs will be installed to limit unauthorized parking. Stage 1 This stage provides for the repair of internal streets, including the office parking area with 8 seats - replacement of road curb, milling…
Show full description
… of asphalt pavement and laying of a new wear layer of dense asphalt concrete. When replacing curbs and according to the requirements for an accessible environment, it is necessary to dismantle and reconstruct an existing sidewalk from the south of the central approach to the hospital. It is planned to build park lighting. Rainwater drainage will be, through rain shafts, connected to the existing rain drainage system. The project involves the revision of shafts of underground infrastructure and the replacement of lids. It is planned to build a new fence in the western part of the property. Stage 2 It is envisaged the construction of an official parking lot with 18 parking spaces with a common entrance-exit to the emergency medical center, the construction of a system for controlled access and overhaul of an internal street in the scope of design. Similarly to Stage 1, asphalt pavement and concrete slabs will be used to build adjoining sidewalks. It is planned to build park lighting. Rainwater drainage will be through rain shafts connected to the existing rain drainage system. The subject-matter of this contract covers the overall performance of
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Участниците, регистрирани и упражняващи дейност в Република България, следва да притежават регистрация в Централния професионален регистър на строителя (ЦПРС) към Камарата на строителите в Република България, съгласно чл. 3, ал. 2 от Закона за Камарата на стро… ▸▾
Участникът трябва да има застраховка „Професионална отговорност“ за вреди, причинени на други участници в строителството и/или на трети лица, в следствие на неправомерни действия или бездействия при или по повод изпълнение на задълженията им по смисъла на чл. … ▸▾
За последните 5 (пет) години, считано от датата на подаване на офертата, участ-никът трябва да е изпълнил минимум едно строителство идентично или сходно с предмета на обществената поръчка. Под „дейности с предмет сходни с тези на поръчката“ следва да се разбир… ▸▾
За изпълнение на дейностите по строителство, участникът трябва да разполага с персонал и/или с ръководен състав с определена професионална компетентност за изпълнението на поръчката (чл. 63, ал. 1, т. 5 от ЗОП), както следва: „Технически ръководител“ – с образ… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Партньори-А.Т. ЕООД | 27 | 2017–2026 |
| БРАТЯ БЛЕЦОВИ ООД | 12 | 2022–2026 |
| ПЪТСТРОЙ ВДХ ЕАД | 11 | 2022–2026 |
| М - БУС ООД | 10 | 2018–2026 |
| ИВ ТРЕЙД ООД | 10 | 2023–2026 |
How often this buyer tenders this