Engineering – design, performance of construction and installation works and exercise of author's supervision on the object: "Implementation of measures to improve energy efficiency of a kindergarten in the village of Barakovo, municipality of Kocherinovo".
„Инженеринг – проектиране, изпълнение на СМР и упражняване на авторски надзор на обект: „Въвеждане на мерки за подобряване на енергийната ефективност на детска градина в село Бараково, община Кочериново“.
Bulgaria · how to bid here →
Your path to submission
- Deadline: 12 October at 23:59 — 9 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (19 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to МЕРИДИАН ЕООД.n = 19
- 41% of this buyer's awards went to companies that had already won here before (70 awards since 2022, spread over 42 companies). That is well below the sector norm (61%) — this buyer switches suppliers more often than others.n = 70 awards since 2022
- The median procedure drew 2 bids (67 procedures with a bid count); 49% ended with a single bidder. Sector: median 2 bids.n = 67
- 0% of the bids received came from small and medium-sized enterprises (14 procedures with a bid mix). Sector: 17%.n = 14
- Not one of the 70 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 70
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 3 (from 17 awards).
What the buyer is looking for
‘Engineering – designing, implementing works and supervising a site: ‘Introduction of measures to improve the energy efficiency of a kindergarten in the village of Barakovo, Kocherinovo municipality’.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| М-ФОРМА ООД | 4 | 2025–2026 |
| ЕВРО МИЙТ ЕНД МИЛК ЕООД | 4 | 2025 |
| НИВЕЛ СТРОЙ ЕООД | 4 | 2025 |
| ПЕТРОЛ АД | 4 | 2025–2026 |
| Електрохолд Трейд ЕАД | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.