Friedrich & ClementBETA

Selection of contractor for construction and installation work for the object: Restoration of the conductivity of the river bed of Brestova River in the urbanized zone of village Veselinovo, municipality of Smyadovo

„Избор на изпълнител на СМР за обект: Възстановяване проводимостта на речното корито на река Брестова в урбанизираната зона на село Веселиново, община Смядово“

Bulgaria · how to bid here →

Your path to submission

  1. Deadline: 13 October at 23:59 — 7 days left.
  2. You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
  3. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (32 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to ТЕХНОСТРОЙ - Г ЕООД.n = 32
  • 55% of this buyer's awards went to companies that had already won here before (102 awards since 2018, spread over 42 companies). 45% went to new names.n = 102 awards since 2018
  • The award came in at a median 85% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 6
  • The median procedure drew 2 bids (91 procedures with a bid count); 41% ended with a single bidder. Sector: median 2 bids.n = 91
  • 0% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 17%.n = 9

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,146 recorded awards).

Typical field: median 2 (from 31 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject matter of the contract is: ‘Selection of a construction and installation works contractor for a site: Restoration of the conductivity of the riverbed of the Brestova River in the urbanised area of the village of Vesselinovo, Smyadovo Municipality.’ Cleaning of the entire design length of the riverbed and floodplains should be carried out in a differentiated manner. Priority is given to removing fallen and inclined trees and others that create the greatest obstacle in the way of water flow. To improve the overall roughness along the trench, it is envisaged to create two consecutive longitudinal average slopes, which essentially describe the average slope of the river in the section under study. An active conductive strip is created with a minimum width along the bottom of 7.0 m. In areas where the natural bottom of the river is wider, the leveling continues until the shore…

Show full description

… crosses in a transverse direction. In the transverse profiles, the connection between the cleaned deposits in the stream and the terraces is performed with a slope of 1:2. Only in separate exceptions, in which the boundary of the property is located near, a slope to the coastal terraces 1:1.5 is used, which practically avoids generating a large excavation mass. The initial and final profile of the cleaning area practically fits smoothly with the natural slope along the length of the river. In single profiles, leveling of the bottom through a minimum bulk layer is provided, practically using the material from neighboring excavations. The earth alignment material in the case of a thin embankment shall contain at least 50% rock fraction. Cleaning of vegetation is divided into two zones. Zone 1 – Blonde/bottom of active trough (within main stream) • Zone width – 7.0 m • Vegetation is completely removed. The volume is minimal because at the moment this strip coincides with the existing wetted perimeter of the river • The bottom is formed by the design elevations for the corresponding transverse profile, following the design longitudinal slope (smooth change along the route). Rational

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

BuyerОБЩИНА СМЯДОВО
TypeWorks
Estimated value220.413 €
Published18 September 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
ТЕХНОСТРОЙ - Г ЕООД192024–2026
ЕКОИНВЕСТ АСЕТС АД52021–2026
Ес Еф Ей Ритейл - 2 ЕАД52025–2026
БРАТЯ ВЕЛИКОВИ ООД42018–2024
РЕЗОНИНВЕСТ 12 ЕООД42025–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202410
202527
202632

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Tuesday 13 October at 23:59

How to bid

Read the full notice — Original + documents
Goes directly to this tender on ЦАИС ЕОП. The full specification and all annexes are there.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →