Selection of a registered auditor for the needs of "ICG B" AD for 2026
Избор на регистриран одитор за нуждите на „АЙ СИ ДЖИ БИ“ АД за 2026 г.
Bulgaria · how to bid here →
Your path to submission
- Deadline: 8 October at 23:59 — 5 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 9 months (5 awards, most recently October 2025) — by that rhythm the next award was due around June 2026. The last award went to Angelos Katramados.n = 5
- 52% of this buyer's awards went to companies that had already won here before (63 awards since 2019, spread over 26 companies). That is well below the sector norm (66%) — this buyer switches suppliers more often than others.n = 63 awards since 2019
- The median procedure drew just one bid (52 procedures with a bid count); 63% ended with a single bidder. Sector: median 3 bids.n = 52
- The award came in at a median 56% of the estimated value (15 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 75%.n = 15
- 0% of the bids received came from small and medium-sized enterprises (14 procedures with a bid mix). Sector: 25%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Bulgaria · Business services, 8 contracts went to foreign companies over the last 3 years (of 4,546 recorded awards).
Typical field: median 1 (from 5 awards).
What the buyer is looking for
ICGB is a company incorporated in Bulgaria which operates the IGB gas pipeline (Interconnector Greece-Bulgaria). The interconnector has a length of approximately 182 km and a technical capacity of 3 billion cubic meters per year (billion cubic meters), with the possibility of increasing the transport capacity to 5 billion cubic meters. The route of the facility is between Komotini, Greece and Stara Zagora, Bulgaria. The IGB gas pipeline connects the gas transmission systems of DESFA and TAP in Komotini to the transmission system of Bulgartransgaz EAD in Stara Zagora. Main activities covered by the contract in relation to the auditing of ICGB AD’s financial statements for 2026: Preliminary audit to review ICGB AD’s preliminary financial statements as at 30 September 2026, Independent financial audit of ICGB AD’s annual financial statements as at 31 December 2026, Group Reporting Package to the Consolidating Parent Company for the financial year 2026 and Report to the Audit Committee of the Assignor.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ВНВ-74 ЕООД | 6 | 2025–2026 |
| ИНТЕР ТРАНС ИНЖЕНЕРИНГ ЕООД | 4 | 2024–2025 |
| ФЛУИД КОНТРОЛ ООД | 4 | 2024–2026 |
| ПРОСТРИЙМ ТЕХНИК ООД | 4 | 2025–2026 |
| СИАД БЪЛГАРИЯ ЕООД | 4 | 2023–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.