Major repair of roof waterproofing of Circulation Pump Station 3 (CPS-3) building with bituminous membrane
Основен ремонт на покривна хидроизолация на сграда Циркулационна помпена станция 3 (ЦПС-3) с битумна мембрана
Bulgaria · how to bid here →
Your path to submission
- Deadline: 20 October at 23:59 — 17 days left.
- You submit on ЦАИС ЕОП — not here and not by e-mail. ↗
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (79 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to ЕНЕРГОМОНТАЖ - МК ЕООД.n = 79
- 63% of this buyer's awards went to companies that had already won here before (1,611 awards since 2017, spread over 413 companies). 37% went to new names.n = 1,611 awards since 2017
- The median procedure drew just one bid (1,316 procedures with a bid count); 52% ended with a single bidder. Sector: median 2 bids.n = 1,316
- 7% of awards went to companies from abroad (1,611 awards with a known winner country). Sector average: 0%.n = 1,611
- The award came in at a median 95% of the estimated value (207 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 98%.n = 207
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Bulgaria · Construction work, 16 contracts went to foreign companies over the last 3 years (of 20,099 recorded awards).
Typical field: median 2 (from 71 awards).
What the buyer is looking for
This order is for laying a new waterproofing of the roof of the main building, which includes the roofs above the Machine Hall, Command Hall №1, roof above the suction chambers and roof above the entrance room of filters (rem. C3-109). In general, works involving the supply of construction materials and products are: Dismantling activities: Part "Architectural": dismantling of tin plating - 283 m2; dismantling of impregnated boards - 1.3 m3; dismantling without preservation of existing voronki - 18 pcs.; dismantling of old bitumen waterproofing on compromised areas (up to 5% of the area) - 139 m2; cutting a strip in an existing waterproofing to reach a strong base (roof leveling screed) with a width of up to 35 cm. - 6,5 m2; manual loading, transportation and delivery of construction waste - 0.8 t; manual loading, transportation and delivery of bitumen waste - 2.9 t; loading and…
Show full description
… transportation of metal and wood waste to the Employer's Depot - 2 pt; Part "Electric": dismantling with preservation of existing lightning protection from aluminum wire F8mm. - 51 m; dismantling a floodlight with preservation - 3 pcs.; dismantling of cable with preservation for further use - 115 m; dismantling of a pipe cable route with preservation for further use - 70 m; dismantling of junction box PCOM - 1 pcs.; dismantling of PVC hose - 15.8mm - 45m Construction and installation activities: Part "Architectural": Brick masonry - board building - 0.5 m3 - Making an additional reinforced concrete board with dimensions 20/30 cm of concrete class B20, anchored to the roof panels to provide an additional fire protection barrier - 1m³; making a formwork with a height of 35 cm and subsequent decoding - 13 m2; manufacture and installation of reinforcement - simple complexity Ø 6.5 mm (≤ 2 kg/m') of steel A1 - 110 kg; delivery and installation of impregnated boards with a thickness of 3 cm. length of the board - 1.3 m³; supply and installation of waterproof plywood up to 30 cm wide and 21 mm thick., mounted horizon
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| АТОМЕНЕРГОРЕМОНТ АД | 44 | 2018–2026 |
| ЕСКО ИНЖЕНЕРИНГ АД | 30 | 2018–2026 |
| АДЕН ГРУП ООД | 29 | 2018–2026 |
| ИПУ-СОФИЯ ЕООД | 29 | 2018–2026 |
| ФИНОКЕМ ООД | 29 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.