Bauunterhaltsleistungen STLB - 630 Maurerarbeiten
Germany · Köln · how to bid here →
Your path to submission
- Deadline: 6 November at 10:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (98 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to R. Braun und Sohn & Co. GmbH.n = 98
- The median procedure drew 2 bids (192 procedures with a bid count); 36% ended with a single bidder. Sector: median 4 bids.n = 192
- 36% of this buyer's awards went to companies that had already won here before (194 awards since 2017, spread over 124 companies). 64% went to new names.n = 194 awards since 2017
- Across 20 procedures with structured selection criteria, this buyer most often required: References: supplies (18 of 20), Trade register enrolment (18 of 20), Staff qualifications (2 of 20), Quality management (2 of 20).n = 20
- 1% of awards went to companies from abroad (194 awards with a known winner country). Sector average: 0%.n = 194
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction work, 672 contracts went to foreign companies over the last 3 years (of 242,267 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 3 (from 131 awards).
What the buyer is looking for
contractors University Hospital Cologne (AöR), represented by medfacilities GmbH, Gleueler Str. 66, 50931 Cologne, and medfacilities Betriebs GmbH. Subject of the invitation to tender Lots of framework contracts are tendered for ongoing construction maintenance services according to the Standard Performance Book (STLB) in ongoing hospital and building operation. The relevant trades and performance items are binding from the procurement documents. Framework contracts will be concluded with up to five contractors per lot. The call for tenders is open to companies that have the necessary expertise and capacity for at least one lot and are able to provide services in day-to-day hospital operation. Lots Lot 1: Masonry work Lot 2: Concrete works Lot 3: Roofing and roof waterproofing work Lot 4: Drywall works Lot 5: Plastering and stucco work Lot 6: Scaffolding work Lot 7: Tiling and slab…
Show full description
… work Lot 8: Screed work Lot 9: Carpentry Lot 10: Glazing work Lot 11: Painting, painting and coating work Lot 12: Flooring work Lot 13: Ventilation systems Lot 14: Heating and water heating systems Lot 15: Low and medium voltage systems Lot 16: Lightning protection systems Contract duration and retrievals The basic term starts on 01.01.2027 and ends on 31.12.2028. The contracting authority may extend the contract twice for one year at a time. The framework contracts shall expire on 31.12.2030 at the latest. Individual contracts will be awarded according to the order of precedence established for each lot. First, the first-placed contractor will be considered. If the contractor is unable to perform the contract, in particular due to a lack of capacity, the next contractor in the order of precedence will be requested. The type, scope and execution periods result from the respective individual order. Retrievals are made in text form. There is no minimum purchase, retrieval guarantee or exclusivity. The client is also entitled to award services outside the framework contract. Price submission and evaluation Each lot will be evaluated exclusively on the basis of the following price items: Up or down bidding on the predetermined STLB prices: 80 points Overall valuation price for hourly wage work outside the STLB or service list: 10 points Material cost surcharge for material deliveries outside the STLB or service specifications: 10 points The STLB prices are specified by the customer and contain all price-forming cost components. The tenderer shall submit only one positive bid or one bid per lot as a percentage. The simultaneous submission of a tender and a tender as well as conditional tenders or tenders dependent on the award of several lots shall not be permitted. Hourly wage work and material cost surcharges may only be applied for services or materials that are not already included in the STLB or list of services. A double pricing is excluded. The evaluation is carried out by linear interpolation. Details can be found in the procurement documents. Lot limitation and prioritisation The award limit shall not exceed five lots per undertaking. Tenders may be submitted for several or all lots. A voluntary lower lot limit can be explained in the form provided. The "Loss Limitation and Priority List" form shall be used on a mandatory basis. Clear and continuous priorities must be indicated for each lot tendered. Socially affiliated companies as well as activities as subcontractors or aptitude-creating companies are taken into account in the lot limitation. Missing or ambiguous information will not be requested or clarified. suitability Prequalified companies can prove their suitability by the prequalification according to § 6b EU VOB/A, provided that the deposited documents fully cover the requirements. Non-prequalified companies have the complete a
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Dedalus HealthCare GmbH | 9 | 2025 |
| R. Braun und Sohn & Co. GmbH · Troisdorf | 6 | 2020–2026 |
| Apleona Wolfferts GmbH | 5 | 2019–2022 |
| Elektrohaus Bernhard Günther GmbH & Co. KG · Köln | 4 | 2024 |
| SVA System Vertrieb Alexander GmbH | 4 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.