Mobiles bidirektionales AC/DC-Leistungssystem
Germany · Ilmenau · how to bid here →
Your path to submission
- Deadline: 21 October at 07:30 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 64% of this buyer's awards went to companies that had already won here before (108 awards since 2023, spread over 37 companies). That is well above the sector norm (43%) — newcomers have a harder time here than elsewhere.n = 108 awards since 2023
- The median procedure drew just one bid (105 procedures with a bid count); 70% ended with a single bidder. Sector: median 2 bids.n = 105
- 1% of awards went to companies from abroad (108 awards with a known winner country). Sector average: 4%.n = 108
- Across 8 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (8 of 8), Minimum number of managers (8 of 8), Share of subcontractors (8 of 8), Average minimum annual turnover (8 of 8).n = 8
- From notice to award takes a median 73 days here (28 procedures). Sector: 86 days.n = 28
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Germany · Electrical machinery, 220 contracts went to foreign companies over the last 3 years (of 5,902 recorded awards) — mostly from Italy, Austria, Netherlands.
Typical field: median 2 (from 5,511 awards).
What the buyer is looking for
The subject of the procurement procedure is the supply of a mobile, bidirectional AC/DC power system for use in a development and testing laboratory. The system shall: can be operated both as a programmable electrical source and as a sink and bidirectional energy transmission between the AC supply network and the Allow DC side. × The required total rated power is 150kW . The system is designed for DC operation up to 800V per channel and for the series and designing parallel modes of operation.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| sysGen gmbh · Bremen | 6 | 2024–2026 |
| FEI Deutschland GmbH | 6 | 2025 |
| InfraTec GmbH · Dresden | 5 | 2025 |
| Werth Messtechnik GmbH · Gießen | 5 | 2025 |
| Rittal GmbH & Co. KG · Herborn | 4 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.