26E40261; Landeskriminalamt Nds. / LKA Nds.; Neubau Bauteil G/KTI; Kältetechnische Anlagen
Germany · Hannover · how to bid here →
Your path to submission
- Deadline: 4 November at 09:30 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (597 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Johann Osmers GmbH & Co. KG.n = 597
- 56% of this buyer's awards went to companies that had already won here before (844 awards since 2021, spread over 369 companies). That is well above the sector norm (40%) — newcomers have a harder time here than elsewhere.n = 844 awards since 2021
- The median procedure drew 3 bids (843 procedures with a bid count); 30% ended with a single bidder. Sector: median 4 bids.n = 843
- The award came in at a median 86% of the estimated value (305 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 89%.n = 305
- Across 27 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (22 of 27), References: works (22 of 27), Minimum annual headcount (9 of 27), Average minimum turnover in the contract field (6 of 27).n = 27
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 03/10/2026.
Foreign bidders
In Germany · Construction work, 668 contracts went to foreign companies over the last 3 years (of 241,570 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 2 (from 628 awards).
What the buyer is looking for
New construction of a laboratory building with - 4 pcs. screws - liquid cooler, refrigerant R1234ze 750 kW - 4 pcs. sound insulation enclosure for offered refrigeration machine - 2 pcs. glycol recooler adiabat - 6 pcs. separator dirt magnetite installation horizontal steel water glycol PN16 DN200 - 6 pcs. pressure holding system diaphragm pressure expansion vessel pump - 4 pcs. self-optimizing vacuum splash drill degassing with re-feeding - 2 pcs. cold storage system steel 1storage 6000l cold insulation glued 4 pieces - 3 pcs. dirt separator with flange, 110 °C - 1 pcs. plate heat exchanger steel niro PN10 - 27 pcs. centrifugal pump dry rotor steplessly adjustable - 78 pcs. vibration compensator, locked Sizes - 4 pcs. round pipe cooling water distributor for flow or return - 5,000 kg mould/hollow profile steel structure steel verz - 804 pcs. reducer carbon steel welding climatic cold…
Show full description
… water AD, ver. Dimensions - 3,081 pcs. arc carbon steel welding climatic cold water AD, ver. Dimensions - 15 pcs Fan Convector Cooling Air Filter Radial Fan(s) 230/400VAC
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
1. Angaben zur Leistung, die mit der zu vergebenden Leistung vergleichbar sind aus bis zu fünf abgeschlossenen Kalenderjahren. zu 1. Drei Referenznachweise mit mindestens folgenden Angaben: Ansprechpartner, Art der ausgeführten Leistung, Auftragssumme, Ausführ… ▸▾
1. Umsatz des Unternehmens in den letzten drei abgeschlossenen Geschäftsjahren soweit es Bauleistungen und andere Leistungen betrifft, die mit der zu vergebenden Leistung vergleichbar sind, unter Einschluss des Anteils bei gemeinsam mit anderen Unternehmen aus… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Hans Schulz Gebäudereinigung GmbH | 17 | 2022–2026 |
| Glasreinigung Merkur August Hartmann GmbH & Co. KG | 15 | 2022–2026 |
| Hartmann + Schwarz Haus- und Versorgungstechnik GmbH · Goslar | 12 | 2023–2025 |
| Gies Dienstleistungen GmmbH · Hennef | 12 | 2025–2026 |
| Peter Schneider Gebäudedienstleistungen GmbH & Co. KG · Berlin | 11 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.