Area 1 Rabenstein, Reichenbrand, Siegmar, Schönau, Rottluff
Gebiet 1 Rabenstein, Reichenbrand, Siegmar, Schönau, Rottluff
Germany · Chemnitz · how to bid here →
Your path to submission
- Deadline: 2 November at 08:00 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (219 procedures with a bid count); 32% ended with a single bidder. Sector: median 5 bids.n = 219
- 49% of this buyer's awards went to companies that had already won here before (226 awards since 2018, spread over 113 companies). 51% went to new names.n = 226 awards since 2018
- 68% of the bids received came from small and medium-sized enterprises (119 procedures with a bid mix). Sector: 90%.n = 119
- 0% of the bids received came from other countries (119 procedures with a bid mix) — all bidders, not just the winners. Sector: 5%.n = 119
- Across 22 procedures with structured selection criteria, this buyer most often required: Professional register enrolment (15 of 22), References: works (12 of 22), References: services (6 of 22), Minimum annual headcount (6 of 22).n = 22
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Agricultural services, 222 contracts went to foreign companies over the last 3 years (of 12,543 recorded awards) — mostly from Austria, Poland, Netherlands.
Typical field: median 6 (from 6 awards).
What the buyer is looking for
Lot 1 - Area 1 includes Rabenstein: 18 green areas, Reichenbrand: 5 green spaces, Siegmar: 5 Rules on top-up limitation: A maximum of 2 lots per tenderer will be awarded. First of all, for each lot, all tenders will be ranked according to the lowest price criterion. Thereafter, the most economically advantageous tender will be determined (maximum overall price gap in percentage terms when comparing the lots; Determination of the percentage value per lot from the next tender or, in the absence of a higher tender, from the price schedule). First, the lot will be awarded, which will be the most economically advantageous tender overall. Thereafter, the lot for which the most economically advantageous tender is available will be awarded, subject to the award limit, and immediately until all the lots have been awarded or no more eligible tenders are available. Special scheme: Exceptionally,…
Show full description
… if the allocation rule for a lot no longer allows tenders to be taken into account, a third contract will be awarded to the most economically advantageous tender from a tenderer. Lot 2 - Area 2 includes Altendorf: 15 green areas, Glösa: 15 green spaces, Borna/ Heinersdorf: 7 green areas Rules on top-up limitation: A maximum of 2 lots per tenderer will be awarded. First of all, for each lot, all tenders will be ranked according to the lowest price criterion. Thereafter, the most economically advantageous tender will be determined (maximum overall price gap in percentage terms when comparing the lots; Determination of the percentage value per lot from the next tender or, in the absence of a higher tender, from the price schedule). First, the lot will be awarded, which will be the most economically advantageous tender overall. Thereafter, the lot for which the most economically advantageous tender is available will be awarded, subject to the award limit, and immediately until all the lots have been awarded or no more eligible tenders are available. Special scheme: Exceptionally, if the allocation rule for a lot no longer allows tenders to be taken into account, a third contract will be awarded to the most economically advantageous tender from a tenderer. Lot 3 - Zone 6 covers Reichenbrand: 1 high-quality, listed green area Rules on top-up limitation: A maximum of 2 lots per tenderer will be awarded. First of all, for each lot, all tenders will be ranked according to the lowest price criterion. Thereafter, the most economically advantageous tender will be determined (maximum overall price gap in percentage terms when comparing the lots; Determination of the percentage value per lot from the next tender or, in the absence of a higher tender, from the price schedule). First, the lot will be awarded, which will be the most economically advantageous tender overall. Thereafter, the lot for which the most economically advantageous tender is available will be awarded, subject to the award limit, and immediately until all the lots have been awarded or no more eligible tenders are available. Special scheme: Exceptionally, if the allocation rule for a lot no longer allows tenders to be taken into account, a third contract will be awarded to the most economically advantageous tender from a tenderer. Lot 4 - Area 9 includes Helbersdorf: 10 green areas, Kapellenberg: 6 green areas, city park: 5 green areas Rules on top-up limitation: A maximum of 2 lots per tenderer will be awarded. First of all, for each lot, all tenders will be ranked according to the lowest price criterion. Thereafter, the most economically advantageous tender will be determined (maximum overall price gap in percentage terms when comparing the lots; Determination of the percentage value per lot from the next tender or, in the absence of a higher tender, from the price schedule). First, the lot will be awarded, which will be the most economically advantageous tender overall. Thereafter, the lot with the most economically advantageous tender in total will be awarded, subject to the award limit, and immediately until all the lots are awarded.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bauconzept Planungsgesellschaft mbH | 9 | 2015–2026 |
| MTW Elektrobau GmbH | 6 | 2008–2024 |
| Weinhold Ingenieur GmbH · Rathenow | 6 | 2024 |
| TIP-TOP Dienstleistungen GmbH | 5 | 2009–2026 |
| Sell GmbH | 5 | 2023–2026 |