Your path to submission
- Deadline: 2 November at 11:00 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 41% of this buyer's awards went to companies that had already won here before (71 awards since 2020, spread over 42 companies). 59% went to new names.n = 71 awards since 2020
- The median procedure drew 2 bids (68 procedures with a bid count); 31% ended with a single bidder. Sector: median 2 bids.n = 68
- 8% of awards went to companies from abroad (71 awards with a known winner country). Sector average: 1%.n = 71
- Across 8 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (7 of 8), Quality control by institutes (3 of 8), Information security required (2 of 8), Quality management (2 of 8).n = 8
- From notice to award takes a median 66 days here (20 procedures). Sector: 87 days.n = 20
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Repair & maintenance, 74 contracts went to foreign companies over the last 3 years (of 12,713 recorded awards) — mostly from Austria, Netherlands, Poland.
Typical field: median 2 (from 10,654 awards).
What the buyer is looking for
Sprinkler, foam extinguishing and spray flooding systems. These facilities are located in the underground car park, in parts of archives, casino and cafeteria. Wall hydrants and fire extinguishers. These are 186 wall-mounted hydrant cabinets and approximately 450 fire extinguishers (annual maintenance and, if necessary, replacement of approximately five to ten units per year). Gas extinguishing system. It is a single system installed in the data center. Riser pipes and fire extinguishers. There are three dry risers and 256 fire extinguishers. Gas extinguishing systems. There are two gas extinguishing systems, one in the large data center (NRZ) and one in a server room.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Adesso SE | 4 | 2022–2025 |
| Heisse Werbemittel · Halver | 3 | 2022–2026 |
| Medientechnik Thomas Goelke · Düsseldorf | 3 | 2025 |
| Sennheiser Vertrieb & Service GmbH & Co.KG · Barleben | 3 | 2025 |
| nachtblau GmbH · Hamburg | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.