Outdoor facilities object planning
Freianlagen Objektplanung
Germany · Dietzenbach · how to bid here →
Your path to submission
- Deadline: 22 October at 09:00 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (74 awards, most recently July 2026) — by that rhythm the next award was due around October 2026. The last award went to Gruner Deutschland GmbH.n = 74
- 53% of this buyer's awards went to companies that had already won here before (402 awards since 2019, spread over 180 companies). 47% went to new names.n = 402 awards since 2019
- The median procedure drew 4 bids (402 procedures with a bid count); 30% ended with a single bidder. Sector: median 3 bids.n = 402
- From notice to award takes a median 84 days here (107 procedures). Sector: 133 days.n = 107
- Across 9 procedures with structured selection criteria, this buyer most often required: References: services (9 of 9), Professional liability insurance (8 of 9), Minimum annual headcount (6 of 9), Average minimum turnover in the contract field (5 of 9).n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 109,680 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 4 (from 75 awards).
What the buyer is looking for
Project description: The district of Offenbach is planning the new construction of a special school with a focus on intellectual development in Rodgau. The new school building is to be built on a plot of land in Rodgau-Dudenhofen south of the Claus-von-Stauffenberg-Schule. +++ Scope of services: The services of the property planning open-air installations according to §§ 39 et seq. HOAI, LPH 1-9 as well as services of the property planning civil engineering structures according to §§ 41 et seq., LPH 1-9 as well as special services are awarded. +++ Project period: A project launch is planned in the first quarter of 2027. A period of approximately 4 years is planned for planning and construction. +++ Project costs: The total budget for the cost group 200-600 is estimated at around 35.15 million euros net. Of this amount, around EUR 21.46 million net is attributable to KG 300 and…
Show full description
… around EUR 10.97 million net is attributable to KG 400. For the outdoor facilities, 1.20 million euros net and for the non-public development a further 700,000 euros net are estimated. +++ For a description of the project requirements, see the project description in the procurement documents. A draft contract will be made available to all tenderers with the invitation to tender at the tendering stage.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Punkte (max. 100) werden auf folgende Kriterien vergeben: - 30 Punkte ab 2 Referenzen zu vergleichbarer Nutzung aus dem Bereich allgemeinbildende Schulen (15 Punkte je Referenz): mind. 75 % HOAI-Grundleistungen gem. §§ 38 ff., mind. 0,5 Mio. Euro netto anreche… ▸▾
Angaben zum Umsatz des Bewerbers der letzten 3 abgeschlossenen Geschäftsjahre für vergleichbare Leistungen (siehe Vergabeunterlagen) in Euro netto. Bei Bewerbergemeinschaften werden die Umsätze der einzelnen Mitglieder addiert und in Summe angegeben. Bei Nachu… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Elektro Essel GmbH & Co. KG · Bad Soden-Salmünster | 13 | 2021–2025 |
| Erben & Hesse Gebäudetechnik GmbH | 8 | 2025–2026 |
| Bosold GmbH | 8 | 2022–2026 |
| Ing. Elmar Bey GmbH & Co.KG | 8 | 2022–2025 |
| Wilhelm Pulver Baudekoration · Frankfurt am Main | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.