2 Fire Engine Vehicles LF10 - Chassis & Assembly/Conversion
2 Löschgruppenfahrzeuge LF10 - Fahrgestell & Auf-/Ausbau
Germany · Bielefeld · how to bid here →
Your path to submission
- Deadline: 21 October at 08:30 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (19 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Swarco Traffic Systems GmbH.n = 19
- 55% of this buyer's awards went to companies that had already won here before (318 awards since 2025, spread over 142 companies). 45% went to new names.n = 318 awards since 2025
- The median procedure drew 3 bids (309 procedures with a bid count); 36% ended with a single bidder. Sector: median 2 bids.n = 309
- 81% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 57%.n = 8
- 1% of the bids received came from other countries (8 procedures with a bid mix) — all bidders, not just the winners. Sector: 5%.n = 8
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 29/09/2026.
Foreign bidders
In Germany · Transport equipment, 449 contracts went to foreign companies over the last 3 years (of 37,464 recorded awards) — mostly from Poland, Austria, Czechia.
Typical field: median 1 (from 23 awards).
What the buyer is looking for
Delivery of a base vehicle (chassis) to be dismantled/remounted, including the fire brigade assembly of a firefighting group vehicle (LF) 10. The contractor is responsible for the compatibility or the necessary interfaces between the chassis and the bodywork. Delivery of loading for the firefighting group vehicles (LF) described in Lot 1 10. The loading (according to lot 2 as well as the AG's provisions) must be delivered approximately 6 months before delivery of the vehicle to the fit-out plant (AN to lot 1). The exact date will be set during the design discussion and communicated between the AG and the AN of Lots 1 and 2. Possible storage costs for AN Lot 1 are to be taken into account in the offer. Temporary storage of the equipment at the customer's premises is NOT possible! The delivery of the load to AN Lot 1 is to be carried out in one delivery.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Safe T Service e.K. · Hövelhof | 8 | 2025–2026 |
| Swarco Traffic Systems GmbH · Unterensingen | 5 | 2025–2026 |
| Elektro Beckhoff GmbH | 5 | 2025–2026 |
| R&W Gebäudereinigung · Ahlen | 5 | 2025 |
| Dirk Dangel · Bielefeld | 5 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.