Grounding Transformers up to 36kV
Erdungstransformatoren_bis_36kV
Germany · München · how to bid here →
Your path to submission
- Deadline: 30 December 2027 at 23:00 — 453 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 10 bids (12 procedures with a bid count); 8% ended with a single bidder. Sector: median 2 bids.n = 12
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 14 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 14 awards since 2018
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 14
- Across 5 procedures with structured selection criteria, this buyer most often required: Quality management (4 of 5), Independent quality certificate (e.g. ISO 9001) (3 of 5), Quality control by institutes (2 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Electrical machinery, 220 contracts went to foreign companies over the last 3 years (of 5,902 recorded awards) — mostly from Italy, Austria, Netherlands.
Typical field: median 4 (from 115 awards).
What the buyer is looking for
Requirements that economic operators must meet with regard to their qualifications: - Completion of a supplier questionnaire - Compliance with the technical specification - Passing of the product test - Passing of the factory audit - Passing of the sample delivery Methods used to verify compliance with the individual requirements: - Positive evaluation of the supplier questionnaire by Thüga AG - Confirmation by the supplier regarding compliance with the technical specification - Existing product inspection - Passing of the factory audit and positive evaluation of the completed trial orders
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ABB AG · Mannheim | 8 | 2010–2017 |
| Philips GmbH | 7 | 2011–2015 |
| Nexans Deutschland GmbH · Hannover | 6 | 2010–2013 |
| Siteco Beleuchtungstechnik GmbH · Traunreut | 5 | 2011–2015 |
| Siemens AG | 5 | 2011–2017 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.