Planning services - outdoor facilities (FA) running tracks and others
Planungsleistungen - Freianlagen (FA) Laufbahnen u. a.
Germany · Wiesbaden · how to bid here →
Your path to submission
- Deadline: 6 October at 06:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 110,078 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 3 (from 103,779 awards).
What the buyer is looking for
The AN shall develop such remediation solutions based on the present draft objectives. and repair of racetracks and adjacent sports areas of the BV, consisting of open-air installations (FA). The Contractor is also responsible for the necessary structural design services. (TW) as an ancillary service. The services provided by the Contractor shall include, in addition to the basic services required for these technical plans: – where appropriate, also the coordination and integration of the various electrical and lighting systems, Irrigation and drainage as well as the entire required TA of the object in the overall planning. In the course of the implementation, the AN is responsible for the planning and tendering of these Objects as FA and ensures the structural requirements such as connections etc. Accordingly, at least the following additional services (ZL) are required Services to be…
Show full description
… provided: • Inspection test according to DIN 18035 and documentation • Safety and rescue route concept • Fire protection certificate In connection with the above-mentioned property planning, the tenderer / contractor shall also develop, inter alia, the the services required and clearly linked to the objectives; the structural design, including the necessary proof of stability. In connection with the above-mentioned property planning, the services of the Contractor also include: all necessary planning services for the technical equipment. In any case, this includes drainage and, if necessary, the entire required TA of the outdoor facilities. The contractor is responsible for the planning of these objects and provides the functional and technical requirements for the structural specifications as well as the necessary connections That's for sure. Accordingly, the following additional included services (IL) must also be provided: • Ground assessments (sports facility-specific, if additionally required) • Light immission detection / light planning / electrical planning (FA) • Irrigation and drainage concept incl. planning Specifically to the services of the planning of the water / wastewater technology developed the AN, inter alia, the necessary and manifestly linked to the objectives Dewatering technology services, including the necessary evidence and connections. These include, inter alia, new irrigation systems, if necessary water supply, further drainage. In addition to the above, all necessary technical equipment design (TA) for this IA are to be provided within the PLANNING and / or there to Integrate.