Bf München-Pasing, New North Entrance, BIM-MEP Planning (HVAC, 50Hz, ICT)
Bf München-Pasing, Neuer Zugang Nord, BIM-TGA-Planung (HKLS, 50Hz, ITK)
Germany · Berlin · how to bid here →
Your path to submission
- Deadline: 19 October at 07:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 77% of this buyer's awards went to companies that had already won here before (1,393 awards since 2024, spread over 320 companies). That is well above the sector norm (44%) — newcomers have a harder time here than elsewhere.n = 1,393 awards since 2024
- The median procedure drew 2 bids (1,390 procedures with a bid count); 39% ended with a single bidder. Sector: median 3 bids.n = 1,390
- Across 38 procedures with structured selection criteria, this buyer most often required: Security of supply required (36 of 38).n = 38
- 1% of awards went to companies from abroad (1,393 awards with a known winner country). Sector average: 0%.n = 1,393
- From notice to award takes a median 119 days here (529 procedures). Sector: 133 days.n = 529
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Germany · Architecture & engineering, 401 contracts went to foreign companies over the last 3 years (of 109,680 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 2 (from 788 awards).
What the buyer is looking for
This award includes the planning of the technical equipment (plant groups 410, 420, 430, 440 and 450) according to BIM methodology for the new access north at Munich-Pasing station. The performance phases 1-2 to HOAI are transferred. Optionally, the power phases 3-7 are provided. The two-storey access building includes a bicycle parking garage, as well as several rental units and a toilet facility.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| DB Engineering & Consulting GmbH · Berlin | 148 | 2024–2026 |
| ai Consult GmbH · Bremen | 32 | 2024–2026 |
| INROS LACKNER SE | 27 | 2024–2026 |
| Werner & Balci GmbH | 26 | 2024–2026 |
| ZETCON Ingenieure GmbH · Bochum | 25 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.