Project Management "Brinkhaus Neighbourhood Development"
Projektsteuerung "Quartiersentwicklung Brinkhaus"
Germany · Warendorf · how to bid here →
Your path to submission
- Deadline: 19 October at 09:00 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 11 months (10 awards, most recently June 2025) — by that rhythm the next award was due around May 2026. The last award went to INGENIEURBÜRO für Straßen- und Tiefbau.n = 10
- The median procedure drew 7 bids (39 procedures with a bid count); 26% ended with a single bidder. Sector: median 3 bids.n = 39
- 47% of this buyer's awards went to companies that had already won here before (39 awards since 2023, spread over 21 companies). 53% went to new names.n = 39 awards since 2023
- From notice to award takes a median 69 days here (14 procedures). Sector: 133 days.n = 14
- 99% of the bids received came from small and medium-sized enterprises (10 procedures with a bid mix). Sector: 89%.n = 10
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Architecture & engineering, 394 contracts went to foreign companies over the last 3 years (of 108,923 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 5 (from 11 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Die vom erfolgreichen Bieter (Projektsteurer) zu erbringenden Leistungen orientieren sich an der AHO - Nr. 9 "Projektmanagement in der Bau- und Immobilienwirtschaft - Standards für Leistungen und Vergütung" (Stand Mai 2025). Es sollen Leistungen sämtlicher Stufen des stufengegliederten Leistungsbildes aus dem Anhang B der AHO sowie Leistungen aus den Handlungsbereichen A bis E von dem Projektsteurer erbracht werden. Es sind aber nur Teilleistungen zu erbringen. Ferner sind konkret benannte Leistungen optional zu erbringen. Der konkrete Leistungsgegenstand wird in der Phase 2 des Verfahrens mitgeteilt.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Wettringer Bauunternehmen GmbH | 3 | 2025 |
| Invest Gebäudeservice GmbH · Herne | 3 | 2025 |
| ESK GmbH Elektrotechnik | 3 | 2024–2025 |
| Boymann GmbH & Co. KG · Glandorf | 3 | 2025 |
| D. P. Fliesen Pelster GmbH · Vreden | 3 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.