Installation and wiring work as well as supply and installation of network technology for an OCR system
Verlege- und Verdrahtungsarbeiten sowie Liefe-rung und Montage von Netzwerktechnik für eine OCR-Anlage
Germany · Nürnberg · how to bid here →
Your path to submission
- Deadline: 15 October at 06:59 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (28 awards since 2022, spread over 27 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 28 awards since 2022
- The median procedure drew 4 bids (27 procedures with a bid count); 15% ended with a single bidder. Sector: median 2 bids.n = 27
- From notice to award takes a median 514 days here (21 procedures). Sector: 86 days.n = 21
- Not one of the 28 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 28
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Electrical machinery, 220 contracts went to foreign companies over the last 3 years (of 5,865 recorded awards) — mostly from Italy, Austria, Netherlands.
Typical field: median 2 (from 5,455 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Öffnen von Kabeltrögen und Kabelschächten,; Lieferung, Verlegen von Kabeln von Netzwerktechnik (SpeedPipe, LWL (Singlemode), Strom); Lieferung eines 42 Höheneinheiten Serverracks Spleißen, LC-Stecker, Patchkabel, Transceivermodule (Singlemode), Speedpipe und LWL Länge jeweils ca. 1.100 m von Stellwerk (Serverrack) bis Schienengate Spleisbox Stromkabellänge ca. 490 m von Verteilerkasten (Weichenheizung) bis Position Schienengate 12 fasiges LWL (Singlemode) Durchmessen der LWL-Fasern; DGUV-Vorschrift 3 Prüfung
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Künz GmbH · Hard | 2 | 2024 |
| Max Bögl Stiftung & Co. KG | 2 | 2022–2023 |
| Vogel Bau GmbH | 1 | 2024 |
| BiGe EUROVIA Verkehrsbau/EUROVIA Infrastructure GmbH | 1 | 2024 |
| BSD Baustoff und Gewässersanierungs GmbH · Dessau-Roßlau | 1 | 2024 |