Lift Systems AWT - Renovation of Central Kitchen
Aufzugsanlagen AWT - Sanierung Zentralküche
Germany · Düsseldorf · how to bid here →
Your path to submission
- Deadline: 13 October at 09:00 — 25 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (559 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Apleona Wolfferts GmbH.n = 559
- The median procedure drew 2 bids (1,087 procedures with a bid count); 34% ended with a single bidder. Sector: median 4 bids.n = 1,087
- 45% of this buyer's awards went to companies that had already won here before (1,097 awards since 2018, spread over 597 companies). 55% went to new names.n = 1,097 awards since 2018
- Across 16 procedures with structured selection criteria, this buyer most often required: Minimum turnover in the contract field (16 of 16), Trade register enrolment (15 of 16), Professional register enrolment (15 of 16), Professional liability insurance (9 of 16).n = 16
- From notice to award takes a median 129 days here (263 procedures). Sector: 87 days.n = 263
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Germany · Construction work, 660 contracts went to foreign companies over the last 3 years (of 240,202 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 2 (from 690 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Im Rahmen der AWT-Anbindung im U1 der Kinderklinik müssen für die AWT-Aufzugsgruppe (K2.1 & K2.2) neue Haltestellen eingerichtet werden. Es sind aktive Schachttüren & die dazugehörigen Steuerungskits zu installieren und in die Aufzugssteuerung zu integrieren. Es ist eine Überwachung der Tür-Zonen notwendig, um ein versehentliches Öffnen der Schachttür zu verhindern, wenn die Kabine in einer anderen Etage steht.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| CMS IT-Consulting GmbH | 25 | 2011–2025 |
| Siemens AG | 17 | 2011–2025 |
| Philips GmbH | 15 | 2012–2026 |
| Holthausen Kälte-, Klima- und Lüftungstechnik GmbH | 14 | 2025–2026 |
| Fladung GmbH · Neuhof | 10 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.