SM KL - BG Sanitary Installation
SM KL - BG Sanitärinstallation
Germany · Koblenz · how to bid here →
Your path to submission
- Deadline: 13 October at 08:00 — 25 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 48% of this buyer's awards went to companies that had already won here before (98 awards since 2019, spread over 51 companies). 52% went to new names.n = 98 awards since 2019
- The median procedure drew 3 bids (98 procedures with a bid count); 17% ended with a single bidder. Sector: median 4 bids.n = 98
- The award came in at a median 98% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 89%.n = 9
- Across 4 procedures with structured selection criteria, this buyer most often required: Product samples (2 of 4), References: supplies (1 of 4), References: works (1 of 4).n = 4
- Not one of the 98 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 98
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Construction work, 660 contracts went to foreign companies over the last 3 years (of 240,202 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 5 (from 12 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Alle Arbeiten zur Herstellung, Montage, Inbetriebnahme und Prüfung von Anlagen für Trinkwasser, Abwasser und sanitäre Einrichtungen.
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Famo Vertrieb | 6 | 2019–2025 |
| WEMO-tec GmbH · Eichenzell | 5 | 2019–2023 |
| ray facility management group / Nils Bogdol GmbH · Holdorf | 5 | 2025 |
| LV-Reinigungsteam GmbH · Rödermark | 4 | 2025–2026 |
| Louis Steitz SECURA GmbH + Co. KG | 4 | 2019–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.