Engineering services technical building systems HVAC according to HOAI, Part 4, Section 2, §§ 53,55, system groups 1-3 in performance phases 1-9.
Ingenieurleistungen Technische Gebäudeausrüstung HLS gemäß HOAI, Teil 4, Abschnitt 2, §§ 53,55, Anlagengruppen 1-3 in den Leistungsphasen 1-9.
Germany · Renquishausen · how to bid here →
Your path to submission
- Deadline: 13 October at 12:00 — 25 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Germany · Architecture & engineering, 394 contracts went to foreign companies over the last 3 years (of 108,923 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 1 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Es sind die Leistungen gem. HOAI, Teil 4, Abschnitt 2, §§ 53,55 ff., LPH. 1-9 Technische Gebäudeausrüstung HLS-Planung für den Neubau zu vergeben. Anlagegruppen: 1. Abwasser-, Wasser- und Gasanlagen (AWG) 2. Wärmeversorgungsanlagen (WVA) 3. Lufttechnische Anlagen (LTA) Die Beauftragung erfolgt auf der Grundlage von Vertragsmustern nach dem Handbuch für Kommunale Vertragsmuster und der Vergabe für Architekten und Ingenieurleistungen. Der Auftraggeber behält sich die stufenweise Beauftragung der Leistungsphasen vor. Es ist beabsichtigt zunächst die LPH 1-4 und im Anschluss LPH 5-9 zu beauftragen. Ein Anspruch auf Gesamtbeauftragung besteht nicht.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bodamer Faber Architekten BDA PartGmbB · Stuttgart | 4 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.