Medium-voltage switchgear up to 36 kV - air-insulated - metal-enclosed -
Leistungsschalteranlagen bis 36 kV - luftisoliert - metallgekapselt -
Germany · München · how to bid here →
Your path to submission
- Deadline: 30 June 2028 at 21:59 — 633 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 10 bids (12 procedures with a bid count); 8% ended with a single bidder. Sector: median 2 bids.n = 12
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 14 companies). That is well below the sector norm (43%) — this buyer switches suppliers more often than others.n = 14 awards since 2018
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. Sector average: 4%.n = 14
- Across 5 procedures with structured selection criteria, this buyer most often required: Quality management (4 of 5), Independent quality certificate (e.g. ISO 9001) (3 of 5), Quality control by institutes (2 of 5).n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Electrical machinery, 221 contracts went to foreign companies over the last 3 years (of 5,931 recorded awards) — mostly from Italy, Austria, Netherlands.
Submission language: DE.
Typical field: median 4 (from 115 awards).
What the buyer is looking for
Requirements that economic operators must meet with regard to their qualifications: - Completion of a supplier questionnaire - Compliance with the technical specification - Passing of the product test - Passing of the factory audit - Passing of the sample delivery Methods used to verify compliance with the individual requirements: - Positive evaluation of the supplier questionnaire by Thüga AG - Confirmation by the supplier regarding compliance with the technical specification - Existing product inspection - Passing of the factory audit and positive evaluation of the completed trial orders
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ABB AG · Mannheim | 8 | 2010–2017 |
| Philips GmbH | 7 | 2011–2015 |
| Nexans Deutschland GmbH · Hannover | 6 | 2010–2013 |
| Siemens AG | 5 | 2011–2017 |
| Siteco Beleuchtungstechnik GmbH · Traunreut | 5 | 2011–2015 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.