Am Pferdemarkt 23-26, Neubau SÖR Betriebszentrale, Rohbauarbeiten im Außenbereich
Germany · Nürnberg · how to bid here →
Your path to submission
- Deadline: 19 October at 07:10 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (43 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Fußböden Fleischmann GmbH.n = 43
- 2% of this buyer's awards went to companies that had already won here before (43 awards since 2024, spread over 42 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 43 awards since 2024
- The median procedure drew just one bid (43 procedures with a bid count); 98% ended with a single bidder. Sector: median 4 bids.n = 43
- Not one of the 43 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 43
- From notice to award takes a median 95 days here (42 procedures). Sector: 87 days.n = 42
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Germany · Construction work, 660 contracts went to foreign companies over the last 3 years (of 240,202 recorded awards) — mostly from Austria, France, Poland.
Typical field: median 1 (from 43 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Mengenangaben in der Übersicht + / - 15 % Hinweis: Die genauen Mengenangaben sind den Leistungstexten zu entnehmen! 1. Waschplatz mit 4 Waschstraßen: Größe ca. 450 m2 - Deckschicht aus Plattenbelag mit Fugenabdichtung ca. 400 m2 - Trennwände aus Betonwänden mit Stahlspritzschutz ca. 115 m 2. Absetzcontaineranlage mit 15 Mulden: Größe ca. 165 m2 - 15 Absetzmulden aus Beton - fünfteilige Stahl Überdachung der Absetzcontainer 3. Fundamente Siloanlagen ca. 120 m2
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| H+H Brandschutz & Service GmbH | 2 | 2025 |
| B.S.B. Beton Sanierung Beschichtung GmbH · Neubiberg | 1 | 2025 |
| Bau Kaltenberg GmbH | 1 | 2025 |
| Boos Werkstatt- und Industrieausrüstung GmbH | 1 | 2025 |
| Burkhardt GmbH | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
ocds-mnwr74-ac9f3bfe-b63b-4e44-8188-700d29bb408e