Installation of PV systems at regional organizations
Instalace FVE na krajských organizacích
Czechia · Ostrava - Moravská Ostrava · how to bid here →
Your path to submission
- Deadline: 2 November at 11:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES, SLK, CES, SLK, CES, SLK, CES, SLK, CES, SLK, CES, SLK.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (10 awards, most recently June 2025) — by that rhythm the next award was due around October 2025. The last award went to Pražská plynárenská, a.s..n = 10
- The median procedure drew 5 bids (818 procedures with a bid count); 14% ended with a single bidder. Sector: median 3 bids.n = 818
- 49% of this buyer's awards went to companies that had already won here before (972 awards since 2015, spread over 192 companies). 51% went to new names.n = 972 awards since 2015
- The award came in at a median 65% of the estimated value (58 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 73%.n = 58
- 52% of the bids received came from small and medium-sized enterprises (478 procedures with a bid mix). Sector: 31%.n = 478
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/09/2026.
Foreign bidders
In Czechia · Petroleum & fuels, 17 contracts went to foreign companies over the last 3 years (of 3,228 recorded awards).
Submission language: CES.
Typical field: median 1 (from 8 awards).
What the buyer is looking for
The subject of the public contract is the installation of photovoltaic power plants on the buildings of organizations established by the Moravian-Silesian Region. In accordance with Section 35 of the Act, the public contract is divided into 6 lots. A detailed definition of the subject-matter of the public contract, including the technical conditions in the details necessary for the processing of the tender, is set out in the annexes to the procurement documents.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech, Slovak.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PHOENIX lékárenský velkoobchod, s.r.o. | 68 | 2022–2026 |
| PHARMOS, a.s. | 64 | 2023–2026 |
| Alliance Healthcare s.r.o. | 61 | 2023–2026 |
| PROMEDICA PRAHA GROUP, a.s. | 57 | 2023–2026 |
| Fresenius Kabi s.r.o. | 44 | 2023–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.