Pipe fittings and tapping valves
Formstücke und Anbohrarmaturen
Germany · München · how to bid here →
Your path to submission
- Deadline: 30 December 2031 at 22:00 — 1914 days left.
- You submit on Vergabemarktplatz (cosinex) — not here and not by e-mail. ↗ Free bidder account on the cosinex platform required (created instantly); offers go through the bidding tool, usually plain text form suffices — no qualified signature. Sort out account and signature first — not on submission day.
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 10 bids (12 procedures with a bid count); 8% ended with a single bidder. Sector: median 2 bids.n = 12
- 0% of this buyer's awards went to companies that had already won here before (14 awards since 2018, spread over 14 companies). That is well below the sector norm (39%) — this buyer switches suppliers more often than others.n = 14 awards since 2018
- Across 5 procedures with structured selection criteria, this buyer most often required: Quality management (4 of 5), Independent quality certificate (e.g. ISO 9001) (3 of 5), Quality control by institutes (2 of 5).n = 5
- Not one of the 14 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Germany · Construction materials, 69 contracts went to foreign companies over the last 3 years (of 6,037 recorded awards) — mostly from Italy, Spain, France.
Typical field: median 3 (from 18 awards).
What the buyer is looking for
Prequalification procedure for the supply of the products fittings and fittings made of polyethylene PE 100 and PE 100-RC for the gas and water supply based on the technical specification of Thüga AG. Description of the procurement (type and scope of the service or indication of needs and requirements) Requirements to be met by economic operators with regard to their qualification: - Completion of a supplier questionnaire - Compliance with the technical specification - Passing of the product test - Passing of the factory audit - Passing of the sample delivery Methods used to verify compliance with the individual requirements: - Positive evaluation of the supplier questionnaire by Thüga AG - Confirmation by the supplier regarding compliance with the technical specification - Existing product inspection - Passing of the factory audit as well as positive evaluation of the completed trial…
Show full description
… orders Duration of the contract, the framework agreement or the dynamic procurement system Duration Unknown The order can be extended Please wait... Further information on the extension The framework group contract has a duration of 2 years. The contract term is optionally extended twice by 12 months each. Maximum extensions 2
What you must prove — eligibility criteria
From the notice of the same procedure on TED — Tenders Electronic Daily.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ABB AG · Mannheim | 8 | 2010–2017 |
| Philips GmbH | 7 | 2011–2015 |
| Nexans Deutschland GmbH · Hannover | 6 | 2010–2013 |
| Siteco Beleuchtungstechnik GmbH · Traunreut | 5 | 2011–2015 |
| Siemens AG | 5 | 2011–2017 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.