Friedrich & ClementBETA

IT SOLUTION FOR LOW VOLTAGE OPERATIONS MANAGEMENT

IT-LÖSUNG ZUR NIEDERSPANNUNGSBETRIEBSFÜHRUNG

Austria · Innsbruck · how to bid here →

Your path to submission

  1. Deadline: 12 October at 10:00 — 8 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: DEU.
  4. Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 3% of this buyer's awards went to companies that had already won here before (37 awards since 2015, spread over 20 companies). That is well below the sector norm (18%) — this buyer switches suppliers more often than others.n = 37 awards since 2015
  • 43% of awards went to companies from abroad (37 awards with a known winner country). Sector average: 40%.n = 37

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Austria · Software & IT systems, 179 contracts went to foreign companies over the last 3 years (of 516 recorded awards) — mostly from Germany, Italy, Switzerland.

Submission language: DEU.

Typical field: median 2 (from 274 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

Introduction of a software solution for low-voltage operation management. The network model data prepared for the NEPLAN network calculation program will be reused and enriched with additional operating data. For this purpose, measurement data from the smart meter system (active work, blind work and voltage values) as well as time series from suitably equipped network stations are integrated. In addition, the connection and use of Grid Control Units (GCU) will be investigated and tested as part of the project.The scope of services includes the licensing of the SW, implementation and maintenance (support 5x8) by an economic operator.

Machine translation (EU eTranslation) — official wording via the PDF link.

What you must prove — eligibility criteria

›
References: supplies
technische und wirtschliche Leistungsfährigkeit
Requirement texts are quoted in the notice's original language — the official wording is binding.

Contract

BuyerTIWAG-Tiroler Wasserkraft AG vertreten durch TINETZ-Tiroler Netze GmbH
TypeSupplies
Estimated valuevalue not published
Published22 September 2026
CategorySoftware & IT systems · CPV 48460000

Who has won here before

CompanyAwardsPeriod
AEP - Umweltbüro Schütz22024
Koncar D&ST – vertreten durch IGI HandelsGmbH12015
Psiacoustic Umweltforschung und Engineering GmbH · Wien12024
Ökoteam OG12024
Holz Klade GmbH · WOLFSBERG12025
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20251
20261

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Monday 12 October at 10:00

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
IT SOLUTION FOR LOW VOLTAGE OPERATIONS MANAGEMENT — Friedrich & Clement