Assessment of Lattone No. 2 and Drumgane GWSs, Design Procurement and Management of Works Associated with the Interconnection to the Public Water Supply System, and Statutory Transfer to Uisce Éireann
Was der Auftraggeber sucht
The Procurement of a Consultant Engineering Service to manage all works associated with the taking in charge of Lattone No. 2 and Drumgane Group Water Schemes in Co. Leitrim by Uisce Éireann. Assessment of current pipe networks of Lattone No. 2 and Drumgane Group Water Schemes. Design of interconnection to Public Water Supply along with 14 other other individual connections in the surrounding area, and GWS network upgrades to UÉ Basic Standards. Procurement of construction contract, project management of works, preparation of all required documents for statutory transfer to Uisce Éireann.
Auftrag
Art der Leistung
Wer bei diesem Auftraggeber bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| Romaquip Ltd | 2 | 2023–2026 |
| Archway Products Ltd | 1 | 2025 |
| Atkins_10323 | 1 | 2024 |
| BABLE GmbH | 1 | 2026 |
| Ballinamore Area Community Council | 1 | 2025 |
Wie oft dieser Auftraggeber so etwas ausschreibt
Kontakt Vergabestelle
Taktik
Dieses Verfahren gibt 26 Tage zwischen Veröffentlichung und Frist — üblich in diesem Land sind 31 (Mittel aus 605 Verfahren). Deutlich knapper als üblich: hier zählt die erste Woche.
Die Frist fällt auf einen Montag — Ihr letzter voller Arbeitstag ist der Freitag davor. Nachweise und Bürgschaften bis Donnerstag beisammen haben.
So bewerben Sie sich
Die nächste nicht verpassen
Solche Ausschreibungen erreichen unsere Nutzer jeden Morgen um 7:30 Uhr — passend zur Firma, auf Deutsch.
Kostenlos starten