Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)
Was der Auftraggeber sucht
To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the…
Auftrag
Art der Leistung
Wer bei diesem Auftraggeber bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| GEO.xyz BVBA | 2 | 2026 |
| Fugro Germany Marine GmbH · Bremen | 2 | 2026 |
| Open Grid Europe GmbH · Essen | 1 | 2026 |
| Worley Projects GmbH | 1 | 2025 |
Kontakt Vergabestelle
Taktik
Dieses Verfahren gibt 33 Tage zwischen Veröffentlichung und Frist — üblich in Deutschland sind 33 (Mittel aus 19.173 Verfahren). Ein normales Fenster für diesen Markt.
So bewerben Sie sich
Die nächste nicht verpassen
Solche Ausschreibungen erreichen unsere Nutzer jeden Morgen um 7:30 Uhr — passend zur Firma, auf Deutsch.
Kostenlos starten