Supply and assembly of hallway furniture (furniture – building G-LDA)
Dodávka a montáž nábytku předsíní (mobiliář – budova G-LDA)
Czechia · Třeboň - Třeboň II · how to bid here →
Your path to submission
- Deadline: 13 October at 00:00 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: CES.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 6% of this buyer's awards went to companies that had already won here before (32 awards since 2018, spread over 12 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 32 awards since 2018
- In this sector the buyer awards roughly every month (4 awards, most recently August 2026) — the next award is due around September 2026 by that rhythm. The last award went to SANTAL spol. s r. o..n = 4
- 19% of awards went to companies from abroad (32 awards with a known winner country). Sector average: 5%.n = 32
- The median procedure drew 2 bids (18 procedures with a bid count); 17% ended with a single bidder. Sector: median 3 bids.n = 18
- 0% of the bids received came from other countries (5 procedures with a bid mix) — all bidders, not just the winners. Sector: 3%.n = 5
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Czechia · Furniture & furnishings, 94 contracts went to foreign companies over the last 3 years (of 3,572 recorded awards) — mostly from Germany, Poland, France.
Typical field: median 3 (from 2,860 awards).
What the buyer is looking for
Předmětem této veřejné zakázky je kompletní výroba a dodávka nábytku předsíní, jeho doprava na místo plnění, odborné zaměření a montáž, uvedení do provozu a předání zadavateli.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in CES.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ILLA & Partners s.r.o. | 3 | 2022 |
| Dřevozpracující výrobní družstvo | 1 | 2022 |
| BTL zdravotnická technika, a.s. | 1 | 2024 |
| CANIS SAFETY a.s. | 1 | 2022 |
| EXTRA SERVIS s.r.o. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.