Purchase of energy-efficient computing and other equipment
Nakup energijsko učinkovite računalniške in druge opreme
Slovenia · Krško · how to bid here →
Your path to submission
- Deadline: 12 October at 00:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: SLV, SLV, SLV.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (26 awards since 2020, spread over 13 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 26 awards since 2020
- 23% of awards went to companies from abroad (26 awards with a known winner country). Sector average: 1%.n = 26
- 17% of the bids received came from other countries (14 procedures with a bid mix) — all bidders, not just the winners. Sector: 0%.n = 14
- The median procedure drew 2 bids (19 procedures with a bid count); 47% ended with a single bidder. Sector: median 3 bids.n = 19
- The award came in at a median 87% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 74%.n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Slovenia · Office & computing machinery, 2 contracts went to foreign companies over the last 3 years (of 717 recorded awards).
Typical field: median 3 (from 717 awards).
What the buyer is looking for
Nakup energijsko učinkovite računalniške in druge opreme: SKLOP 1 – Energijsko učinkoviti računalniki in delovne postaje, SKLOP 2 – Energijsko učinkoviti monitorji, SKLOP 3 - Videokonferenčna oprema in zasloni
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in SLV, SLV, SLV.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| HSE INVEST družba za inženiring in izgradnjo energetskih objektov d.o.o. | 2 | 2024 |
| RIZZO International, Inc. | 1 | 2025 |
| SAVAPROJEKT družba za razvoj, projektiranje, konzalting, inženiring d.d. Krško | 1 | 2025 |
| VALINA, družba za vzdrževanje in čiščenje, d.o.o. | 1 | 2025 |
| Westinghouse Electric Company LLC | 1 | 2025 |