GRETB- Upgrade Works to Building 1 + Building 2 GRETB Training Centre, Mervue Business Park, Mervue, Galway for Galway + Roscommon ETB
Ireland · Athenry · how to bid here →
Your path to submission
- Deadline: 16 October at 00:00 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 6% of this buyer's awards went to companies that had already won here before (33 awards since 2023, spread over 31 companies). That is well below the sector norm (52%) — this buyer switches suppliers more often than others.n = 33 awards since 2023
- The median procedure drew 3 bids (25 procedures with a bid count); 20% ended with a single bidder. Sector: median 5 bids.n = 25
- 3% of awards went to companies from abroad (33 awards with a known winner country). Sector average: 2%.n = 33
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Ireland · Construction work, 113 contracts went to foreign companies over the last 3 years (of 4,990 recorded awards) — mostly from United Kingdom, GRC, Germany.
Typical field: median 5 (from 4,072 awards).
What the buyer is looking for
GRETB- Upgrade Works to Building 1 + Building 2 GRETB Training Centre, Mervue Business Park, Mervue, Galway for Galway + Roscommon ETB
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in ENG.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Kilmartin engineering | 2 | 2024–2026 |
| Travel Trips and Tours Ltd | 2 | 2025 |
| Bradcon Catering Ltd | 1 | 2025 |
| Central Technology Supplies Ltd. | 1 | 2025 |
| Chainsaw Ireland | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.