Tree care services
Arbodienstverlening
Netherlands · Heerlen · how to bid here →
Your path to submission
- Deadline: 29 October at 00:00 — 44 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 3 bids (43 procedures with a bid count); 14% ended with a single bidder. Sector: median 19 bids.n = 43
- 22% of the bids received came from small and medium-sized enterprises (24 procedures with a bid mix). Sector: 69%.n = 24
- 0% of this buyer's awards went to companies that had already won here before (67 awards since 2015, spread over 42 companies). 100% went to new names.n = 67 awards since 2015
- 15% of awards went to companies from abroad (67 awards with a known winner country). Sector average: 1%.n = 67
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Health & social work, 11 contracts went to foreign companies over the last 3 years (of 2,535 recorded awards).
Typical field: median 19 (from 2,358 awards).
What the buyer is looking for
De Opdrachtgever heeft het besluit genomen om een Europese openbare aanbestedingsprocedure te doorlopen, waarbij een Overeenkomst voor de inkoop van Arbodienstverlening wordt gesloten met één Opdrachtnemer, die gedurende de looptijd van de Overeenkomst voldoet aan de voorwaarden voor de uitvoering van de Opdracht. Opdrachtgever zoekt geen standaard arbodienstverlening, maar een proactieve partner die met vernieuwende en praktijkgerichte methoden bijdraagt aan het voorkomen en verminderen van verzuim, ondersteunt met passende digitale oplossingen en stuurt op concrete en meetbare resultaten. zie Bestek
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Aannemingsbedrijf De Jong en Zoon Beesd | 1 | 2015 |
| Achmea Schadeverzekeringen NV | 1 | 2015 |
| Achmea Schadeverzekeringen NV met volgverzekeraars | 1 | 2015 |
| Afas Software B.V. | 1 | 2025 |
| Allianz Benelux N.V. | 1 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.