7. Gesamtschule, Bockmühle - Bodensanierung
Germany · Wuppertal · how to bid here →
Your path to submission
- Deadline: 6 October at 06:15 — 24 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 1 months (42 awards, most recently July 2026) — by that rhythm the next award was due around August 2026. The last award went to AKE Aufzüge und Fahrtreppen GmbH.n = 42
- 16% of this buyer's awards went to companies that had already won here before (108 awards since 2025, spread over 89 companies). That is well below the sector norm (41%) — this buyer switches suppliers more often than others.n = 108 awards since 2025
- The median procedure drew just one bid (106 procedures with a bid count); 72% ended with a single bidder. Sector: median 3 bids.n = 106
- Not one of the 108 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 108
- From notice to award takes a median 75 days here (100 procedures). Sector: 73 days.n = 100
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 11/09/2026.
Foreign bidders
In Germany · Construction work, 649 contracts went to foreign companies over the last 3 years (of 238,564 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 1 (from 41 awards).
What the buyer is looking for
- Baustelleneinrichtung - Baubegleitende Kampfmittelberäumung Baufeld und Kampfmittelfreimessung - Erschütterungsmonitoring für Tiefenabbruch-, Rückbau- und Erdarbeiten - Stelcon-Platten abbrechen und entsorgen – ca. 750m² - Betonsteinpflaster abbrechen und entsorgen- ca. 1.750 m² - Betonplatten abbrechen und entsorgen – ca. 6.250 m² - Asphalt abbrechen und entsorgen – ca. 500 m² - Aushub von Auffüllungen (Schlacke, Bauschutt, Boden etc.) und Entsorgung – ca. 12.500 m³ - Bodenaushub Schluff (BM-0*) und Entsorgung – ca. 3.500 m³ - Altbebauung (Fundamente und sonstige Einbauten aus Beton, Stahlbeton, Ziegelmauerwerk etc.) abbrechen und entsorgen – ca. 1.800 m³ - Rückbau Vertikalbrunnen mit horizontalen Stollen und Verfüllung – ca. 60 m³ - Bodeneinbau als Füllboden aus BM0 Material – ca. 12.500 m³ - Entsorgung Bauschutt/Beton – Stahlbeton RC1 – ca. 3.000 to - Entsorgung Bauschutt/Beton –…
Show full description
… Stahlbeton RC2 – ca. 2.000 to - Entsorgung Bauschutt/Beton – Stahlbeton RC3 – ca. 1.000 to - Entsorgung Bauschutt/Beton – Stahlbeton DK0 – ca. 500 to - Entsorgung Bauschutt/Ziegelmauerwerk RC1 – ca. 1.000 to - Entsorgung Schluff BM-F0* - ca. 6.500 to - Entsorgung Auffüllung (Bauschutt, Schlacken, Aschen) BM-F3 – ca. 5.000 to - Entsorgung Auffüllung (Bauschutt, Schlacken, Aschen) DK0 – ca. 5.000 to - Entsorgung Auffüllung (Bauschutt, Schlacken, Aschen) DK1 – ca. 7.000 to - Entsorgung Auffüllung (visuell Asbest-Zement-Bruchstücke) DK1 – ca. 100 to - Zulage Entsorgung Auffüllung (Bauschutt, Schlacken, Aschen) DK2 – ca. 5.000 to - Zulage Entsorgung Auffüllung (Bauschutt, Schlacken, Aschen) DK3 – ca. 500 to - Entsorgung Asphalt bituminös – ca. 130 to - Entsorgung Asphalt teerstämmig – ca. 50 to
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| BTL Brandschutz Technik GmbH Leipzig | 4 | 2026 |
| VGR RheinRuhr GmbH · Essen | 3 | 2026 |
| Albert Ziegler GmbH | 3 | 2026 |
| Gotthilf Benz Turngerätefabrik GmbH & Co. KG · Winnenden | 2 | 2025 |
| Vennes Erd- u. Tiefbau, Abbruch · Ratingen | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.