Detailed Engineering Planning Technical Equipment - Construction of the Rammelfangen Wastewater Treatment Plant with Rainwater Treatment
Fachplanung Technische Ausrüstung - Neubau der Kläranlage Rammelfangen mit Regenwasserbehandlung
Germany · Saarbrücken · how to bid here →
Your path to submission
- Deadline: 5 October at 09:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (47 awards, most recently April 2026) — by that rhythm the next award was due around June 2026. The last award went to S.I.G SCHROLL CONSULT GmbH.n = 47
- 50% of this buyer's awards went to companies that had already won here before (146 awards since 2018, spread over 73 companies). 50% went to new names.n = 146 awards since 2018
- The median procedure drew 3 bids (118 procedures with a bid count); 30% ended with a single bidder. Sector: median 2 bids.n = 118
- Across 12 procedures with structured selection criteria, this buyer most often required: Trade register enrolment (11 of 12), Technical staff for execution (5 of 12), Technical staff for quality control (4 of 12), Professional liability insurance (4 of 12).n = 12
- From notice to award takes a median 74 days here (50 procedures). Sector: 117 days.n = 50
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Architecture & engineering, 386 contracts went to foreign companies over the last 3 years (of 108,077 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 3 (from 47 awards).
What the buyer is looking for
Fachplanung Technische Ausrüstung gemäß Teil 4, Abschnitt 2 HOAI für die Anlagengruppen 1, 2, 3, 4, 5 und 8 gemäß § 53 HOAI (2) Es soll eine neue Kläranlage zur Nitrifikation, Denitrifikation und Phosphor-Elimination und eine Regenbehandlung hergestellt werden. Als grundlegendes Verfahren für die Abwasserreinigung wurde das BiocosVerfahren angenommen. Um genehmigungsrechtliche Aspekte hinsichtlich Lärm- und Geruchsimmissionen einhalten zu können, wird die komplette Anlage eingehaust.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| REMONDIS Saar Entsorgung GmbH · Saarbrücken | 11 | 2015–2026 |
| Ingenieurbüro P & P GmbH · Wadern | 9 | 2025 |
| PolyChemie GmbH · Saarbrücken | 8 | 2018–2026 |
| Saar Entsorgung GmbH · Kirkel | 8 | 2010–2014 |
| Brenntag GmbH · Duisburg | 6 | 2014–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.