Integrale Untersuchung zur VC-Herkunft im Wasserwerk Neuruppin II - Ingenieurleistungen zur Projektsteuerung
Germany · Neuruppin · how to bid here →
Your path to submission
- Deadline: 5 October at 08:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: DEU.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (10 awards, most recently December 2021) — by that rhythm the next award was due around March 2022. The last award went to Ingenierurbüro Hirsch GmbH.n = 10
- 17% of this buyer's awards went to companies that had already won here before (42 awards since 2018, spread over 35 companies). That is well below the sector norm (46%) — this buyer switches suppliers more often than others.n = 42 awards since 2018
- The median procedure drew 3 bids (41 procedures with a bid count); 24% ended with a single bidder. Sector: median 2 bids.n = 41
- From notice to award takes a median 70 days here (15 procedures). Sector: 117 days.n = 15
- Across 4 procedures with structured selection criteria, this buyer most often required: References: services (4 of 4), Professional liability insurance (2 of 4), Trade register enrolment (1 of 4).n = 4
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Architecture & engineering, 386 contracts went to foreign companies over the last 3 years (of 108,077 recorded awards) — mostly from Austria, Switzerland, Poland.
Typical field: median 3 (from 10 awards).
What the buyer is looking for
Gegenstand der Leistungsvergabe ist die ingenieurtechnische Koordination und fachinhaltliche/fachtechnische Begleitung des Gesamtprojektes im Sinne einer Projektsteuerung. Alles weitere entnehmen Sie bitte der Leistungsbeschreibung.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in DEU.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ALBA Supply Chain Management GmbH · Berlin | 3 | 2021–2024 |
| EEW Energy from Waste GmbH · Helmstedt | 2 | 2024 |
| ALBA Nord GmbH | 2 | 2016–2020 |
| Johanniter Unfall Hilfe e.V. · Brandenburg | 2 | 2022–2023 |
| UmweltPlan Stralsund GmbH · Stralsund | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.