Deep and pipe construction services for the construction of the FGL096
Tief- und Rohrbauleistungen für den Bau der FGL096
Germany · Leipzig · how to bid here →
Your path to submission
- Deadline: 5 October at 10:00 — 24 days left.
- The submission point is stated in the notice (link on the right).
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 45% of the bids received came from other countries (21 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 21
- In this sector the buyer awards roughly every 3 months (24 awards, most recently March 2026) — by that rhythm the next award was due around June 2026. The last award went to FRIEDRICH VORWERK SE & Co. KG.n = 24
- 52% of this buyer's awards went to companies that had already won here before (113 awards since 2018, spread over 54 companies). 48% went to new names.n = 113 awards since 2018
- From notice to award takes a median 195 days here (28 procedures). Sector: 73 days.n = 28
- 69% of the bids received came from small and medium-sized enterprises (21 procedures with a bid mix). Sector: 101%.n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 08/09/2026.
Foreign bidders
In Germany · Construction work, 649 contracts went to foreign companies over the last 3 years (of 238,564 recorded awards) — mostly from Austria, Poland, France.
Typical field: median 2 (from 19 awards).
What the buyer is looking for
Die bestehende Gashochdruckleitung FGL096 DN 500 DP 25 im Teilabschnitt vom Notknotenpunkt Quitzow, SAG 096-31 bis zur SAG 096-33 in Perleberg ist zu sanieren. Im Rahmen von sechs Einzelmaßnahmen sind Rohrauswechslungen von insgesamt 3,4 km Länge auszuführen. Zudem ist die SAG Quitzow zu erneuern. Die Station Quitzow soll für die Errichtung einer Molchschleusenstation vorbereitet werden. Es erfolgt keine Wiederverbindung der FGL096 in der Station Quitzow in Richtung Sargleben; beide verbleibenden Leitungsenden sind dort mit Auswechslung der SAG 096-31 durchfest zu verschließen. Realisierungszeitraum: 03/2028 - 07/2028.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PLE Pipeline Engineering GmbH · Berlin | 11 | 2017–2026 |
| FRIEDRICH VORWERK SE & Co. KG · Tostedt | 6 | 2025–2026 |
| Max Streicher GmbH & Co. KG aA · Deggendorf | 6 | 2018–2025 |
| Anton Meyer GmbH & Co. KG · Neuenhaus | 6 | 2019–2025 |
| Rothenseer Werkstoffprüfung GmbH · Magdeburg | 4 | 2018–2020 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.