DESIGN AND EXECUTION: TransRegio Road Feleac TR 35 - Stage I Metropolitan Ring TR 35 and Connection Roads "Phase I – Metropolitan Ring TR 35 and Connection Roads, LOT 2 - TR35 from km 14+747 (Node 5 Floresti) to Tunnel 1 entrance km 19+600 (Incl. Node 5 [Floresti], node 6 [Cora], node 7 [Colina] and road B4, from Node 7 [Colina] to Regional Hospital and road B4.3 - from connection road B4.2 to connection road B4.1)
PROIECTARE SI EXECUȚIE:Drum TransRegio Feleac TR 35- Et I Centura Metropol TR 35 și Drumuri de Leg “ Faza I – Centura Metropol TR 35 şi Drumuri de leg, LOT 2- TR35 de la km 14+747(Nod 5 Floresti)la intrare Tunel 1 km19+600 (Incl. Nodul 5[Floresti], nodul 6[Cora], nodul 7[Colina] si drum B4, de la Nod 7[Colina] la Spital Regional si drum B4.3-de la drum de legatura B4.2 la drum de keg B4.1) — Originaltitel
Auftrag
Art der Leistung
Wer bei diesem Auftraggeber bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| MARC EDIL THERMO | 8 | 2024–2025 |
| TCI CONTRACTOR GENERAL | 7 | 2024–2026 |
| DAS ENGINEERING GRUP | 6 | 2024 |
| NORD CONFOREST | 6 | 2024–2025 |
| AVRIL | 5 | 2024–2026 |
Wie oft dieser Auftraggeber so etwas ausschreibt
Taktik
Dieses Verfahren gibt 136 Tage zwischen Veröffentlichung und Frist — üblich in diesem Land sind 35 (Mittel aus 1.985 Verfahren). Deutlich großzügiger als üblich — Zeit für ein gründliches Angebot statt eines schnellen.
Die Frist fällt auf einen Montag — Ihr letzter voller Arbeitstag ist der Freitag davor. Nachweise und Bürgschaften bis Donnerstag beisammen haben.
So bewerben Sie sich
Die nächste nicht verpassen
Solche Ausschreibungen erreichen unsere Nutzer jeden Morgen um 7:30 Uhr — passend zur Firma, auf Deutsch.
Kostenlos starten