10015490-Opracowanie projektu zielonego korytarza i szkolenie w zakresie projektowania ulic w Dakarze
10015490-Development of a green corridor project and street design training in Dakar
Niemcy · Eschborn
Czego szuka zamawiający
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, mac…
Zamówienie
Kto dotąd tu wygrywał
| Wykonawca | Udzielone zamówienia | Okres |
|---|---|---|
| GFA Consulting Group GmbH | 370 | 2010–2026 |
| GOPA Consultants | 116 | 2010–2026 |
| GOPA Worldwide Consultants GmbH · Bad Homburg v. d. Höhe | 73 | 2018–2026 |
| AFC Agriculture and Finance Consultants GmbH · Bonn | 59 | 2017–2026 |
| AMBERO Consulting Gesellschaft mbH · Kronberg im Taunus | 46 | 2016–2026 |
Jak często ten zamawiający ogłasza takie zamówienia
Kto zna rytm, przygotowuje się, zamiast reagować.