Gerencia de Ferrocarrils de la Generalitat Valenciana
Spanien · 16 offene Verfahren · 1.398 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Execution of works for the construction project of gauge adaptation measures and complementary actions for the 4,500 series at Naranjos Workshops (Metrovalencia). T.M. Valencia (Valencia).
4.299.137 €UNTERSCHWELLIGFrist 1. Sept. · noch 12 Tage
Supply and installation of 16 railway lifting columns 7.5 T at FGV Naranjos workshop and 20 railway lifting columns 12.5 T at FGV Machado workshop. As well as preventive and corrective maintenance of these equipment.
597.040 €Frist 7. Sept. · noch 18 Tage
Consulting and technical assistance services in the field of risk management and railway safety for Ferrocarrils de la Generalitat Valenciana.
3.825.000 €Frist 7. Sept. · noch 18 Tage
Consulting and technical assistance services in the field of risk management and railway safety for Ferrocarrils de la Generalitat Valenciana.
2.295.000 €Frist 7. Sept. · noch 18 Tage
Supply and installation of 16 railway lifting columns 7.5 T at FGV's Naranjos workshop and 20 railway lifting columns 12.5 T at FGV's Machado workshop. As well as preventive and corrective maintenance of these equipment.
597.040 €Frist 7. Sept. · noch 18 Tage
Maintenance service for auxiliary rolling stock of Ferrocarrils de la Generalitat Valenciana.
360.535 €Frist 7. Sept. · noch 18 Tage
Maintenance service for low-voltage systems in surface stations, stops, tram stops, administrative complexes and Metrovalencia workshops.
4.456.339 €Frist 14. Sept. · noch 25 Tage
Site management, technical assistance and safety and health coordination for the execution of works of the project for clearance adjustment work and complementary actions for the 4,500 series at Naranjos Workshops (Metrovalencia). T.M. València (València).
211.058 €UNTERSCHWELLIGFrist 14. Sept. · noch 25 Tage
Maintenance service for low-voltage systems at surface stations, stops, tram stops, administrative complexes and Metrovalencia workshops.
1.812.356 €Frist 14. Sept. · noch 25 Tage
Supply of natural gas for FGV facilities in Valencia.
1.021.348 €Frist 15. Sept. · noch 26 Tage
Supply of natural gas for FGV facilities in Valencia.
851.123 €Frist 15. Sept. · noch 26 Tage
Long-cycle maintenance service for air conditioning equipment of FGV units 4300 and 4200 in Valencia.
5.256.550 €Frist 16. Sept. · noch 27 Tage
Maintenance Intervention R3 on automatic and semi-permanent couplings of Metrovalencia 4300 series units.
3.698.377 €Frist 16. Sept. · noch 27 Tage
Maintenance Intervention R3 on automatic and semi-permanent couplings of Metrovalencia 4300 series units.
3.698.377 €Frist 16. Sept. · noch 27 Tage
Long-cycle maintenance service for air conditioning equipment of FGV units 4300 and 4200 in Valencia.
5.256.550 €Frist 16. Sept. · noch 27 Tage
Contract for preventive, legal and corrective maintenance of fuel tanks at FGV facilities and stations in the provinces of Alicante and Valencia.
32.800 €UNTERSCHWELLIGFrist 21. Sept. · noch 32 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
20201
2022575
20231.069
2024477
2025649
2026321
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| FAIVELEY TRANSPORT IBERICA, SA | 49 | 2020–2026 |
| ISRINGHAUSEN SPAIN, S.L.U. | 31 | 2023–2026 |
| ALSTOM TRANSPORTE, S.A.U. | 23 | 2023–2026 |
| SCHUNK IBERICA, S.A. | 22 | 2023–2026 |
| SIEMENS RAIL AUTOMATION, S.A.U. | 22 | 2020–2026 |
| STADLER RAIL VALENCIA, S.A.U. | 19 | 2021–2026 |
| EUGENIO GARCIA PALOP · CASTELLO | 17 | 2022–2025 |
| FERCANDAO, S.L. | 14 | 2023–2026 |
| Vodafone España, S.A.U. · ALCOBENDAS | 12 | 2025–2026 |
| Electronic Trafic, S.A. | 12 | 2023–2025 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →