Friedrich & ClementBETA

Dijon Métropole

Frankreich · 16 offene Verfahren · 290 dokumentierte Zuschläge

Aktuelle Ausschreibungen

DIJON METROPOLE - Washing, cleaning, sweeping, cleaning of Talant Tunnel and Daix Covered Trench (TC) on M274 road
480.000 €Frist 31. Aug. · noch 12 Tage
DIJON METROPOLE - Washing, cleaning, sweeping, and flushing of the Talant Tunnel and the Covered Trench (TC) of Daix on the M274 road
Frist 31. Aug. · noch 12 Tage
Dijon Metropole - Engineering services mission for the rehabilitation of bridge P25 boulevard Chanoine Kir in Dijon
UNTERSCHWELLIGFrist 31. Aug. · noch 13 Tage
DIJON METROPOLE - Reception, grinding and forwarding to the Dijon Métropole waste-to-energy facility of bulky items, non-recyclable and incinerable waste from waste collection centers from Dijon Métropole and members of the purchasing group
Frist 1. Sept. · noch 13 Tage
DIJON METROPOLE - Reception, shredding and transfer to the Dijon Métropole WtE facility of bulky items, non-recyclable and incinerable waste from recycling centers from Dijon Métropole and members of the g
Frist 1. Sept. · noch 13 Tage
DIJON METROPOLE - Supply of articulated and standard electric battery-powered buses
Frist 2. Sept. · noch 14 Tage
DIJON METROPOLE - Supply of articulated and standard electric battery-powered buses
Frist 2. Sept. · noch 14 Tage
DIJON METROPOLE - Supply of articulated and standard electric battery-powered buses
Frist 2. Sept. · noch 14 Tage
DIJON METROPOLE - Supply of articulated and standard battery electric buses
Frist 2. Sept. · noch 14 Tage
Dijon Metropole - Inventory of Art Deco Built Heritage
UNTERSCHWELLIGFrist 4. Sept. · noch 16 Tage
DIJON METROPOLE - Construction of a third Tramway line (T3) - Qualified Organization Mission (OQA)
Frist 14. Sept. · noch 26 Tage
Dijon Metropole - Instrumentation of rainwater outlets for the purpose of characterizing reuse potential
UNTERSCHWELLIGFrist 14. Sept. · noch 27 Tage
PURCHASING CENTER - Communication strategy and graphic design
Frist 18. Sept. · noch 30 Tage
PURCHASING CENTER - Communication strategy and graphic design
Frist 18. Sept. · noch 30 Tage
DIJON METROPOLE - Installation of photovoltaic canopies on the employee parking lot of the André Gervais Workshops (relaunch after no-action declaration)
Frist 25. Sept. · noch 37 Tage
DIJON METROPOLE - Installation of photovoltaic canopies on the employee parking lot of the André Gervais Workshops (relaunch after no-action declaration)
Frist 25. Sept. · noch 37 Tage

Einkaufsrhythmus

Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.

2018114
201952
202068
202177
202261
202348
202494
2025141
2026127

Wer hier bisher gewonnen hat

UnternehmenZuschlägeZeitraum
ENVEA42025
FAUN ENVIRONNEMENT42017–2026
EXPERT JARDIN32017–2023
EUROFINS HYDROLOGIE EST32019–2025
ROGER MARTIN32018–2025
SNEF32022–2026
SETEO22017–2025
SODILOR22018–2023
BMB CYRANO La Papeterie de Beaune22022–2026
Avs Communication22018

Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.

Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →