ОБЩИНА ЧАВДАР
Bulgarien · 3 offene Verfahren · 6 dokumentierte Zuschläge
Aktuelle Ausschreibungen
Complete reconstruction of "Mir" Street and reconstruction of sidewalk pavement on other streets in the village of Chavdar, Chavdar Municipality
UNTERSCHWELLIGFrist 25. Aug. · noch 6 Tage
Engineering - design, construction and supervision of object: "Water supply to the village of Chavdar, Chavdar Municipality, 2 boreholes, 1 pumping station, 2 water treatment plants and pressure pipelines from the boreholes to existing pressure reservoirs with a total length of approximately 2.35 km"
1.730.000 €Frist 8. Sept. · noch 19 Tage
Engineering - Design, Construction and Supervision of Object: "Water Supply to Chavdar Village, Chavdar Municipality, 2 Boreholes, 1 Pumping Station, 2 Water Treatment Plants and Pressure Pipelines from the Boreholes to Existing Pressure Reservoirs with a Total Length of Approximately 2.35 km"
Frist 8. Sept. · noch 20 Tage
Einkaufsrhythmus
Vergaben je Jahr — wer den Rhythmus kennt, bereitet sich vor, bevor die Bekanntmachung erscheint.
202410
20254
20263
Wer hier bisher gewonnen hat
| Unternehmen | Zuschläge | Zeitraum |
|---|---|---|
| СИМСТРОЙ-2000 ЕООД | 2 | 2024–2025 |
| СТРОЙНОРМ ЕООД | 2 | 2024–2025 |
| ЕРСТ БАУ ЕООД | 1 | 2024 |
| ЕРСТ БАУ ЕООД; ЕРСТ БАУ ЕООД; РаТек ООД | 1 | 2024 |
Aus 13,7 Mio. dokumentierten Zuschlägen · wer regelmäßig gewinnt, kennt die Anforderungen dieses Auftraggebers — das ist Ihr Wettbewerb.
Neue Ausschreibungen dieses Auftraggebers — morgens um 7:30 in Ihrem Postfach.
Kostenlos starten →