The South East Greenway – Lot 4
Irlande · Wexford
Votre chemin vers le dépôt
- Échéance : 1 octobre à 00:00 — encore 28 jours.
- Le dépôt se fait sur eTenders Ireland — pas ici, pas par e-mail. ↗
- Offre et justificatifs en : ENG.
- Réunissez vos justificatifs — les exigences figurent plus haut ; pour beaucoup, l'analyse explique comment les obtenir.
Soumissionnaires étrangers
En Irlande · Travaux de construction, 111 marchés ont été remportés par des entreprises étrangères sur 3 ans (sur 4 948 attributions recensées) — surtout de Royaume-Uni, GRC, Allemagne.
Concurrence habituelle : médiane 4 (sur 48 marchés).
Ce que recherche l'acheteur
This project involves the construction of Lot 4 which mainly entails 1.5kms of greenway in the Mountelliott townsland, north of New Ross. This is part of the South East Greenway and includes the following works; • Rehabilitation works to the Red Bridge, including removal of existing tracks and decking, repair works where specified, installation of new Greenway deck system, lighting, fencing and guarding etc. • Earthworks to the existing embankment between the Red Bridge and Mount Elliott Lane. • Rehabilitation works within Mount Elliott Tunnel. • Construction of a new bridge structure spanning Mount Elliott Lane with piled foundation supports. • Construction of ramped access to the North of the Mount Elliott tunnel from the Greenway corridor to the R700. • Construct the Greenway Lot 4 Section pavement in accordance with Works Requirements, along with all ancillary works including site…
Afficher la description complète
… clearance, landscaping, finishes, fixtures and fittings, drainage, fencing, lighting, adjacent landowner accommodation works, and all public pedestrian and cyclists infrastructure as specified.
Marché
Qui a déjà remporté des marchés ici
| Entreprise | Attributions | Période |
|---|---|---|
| Quarryview Delevopment Ltd | 13 | 2018–2026 |
| Bightheplumber limited | 8 | 2021–2026 |
| MJS Civil Engineering Ltd | 8 | 2017–2025 |
| Stephen Byrne Plant Hire and Civil Engineering Contractors | 8 | 2014–2025 |
| Kilcaven Property Developments Ltd | 6 | 2017–2024 |
À quelle fréquence cet acheteur lance ce type de marché
Qui connaît le rythme se prépare au lieu de réagir.