Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Ireland · Clonmel, Nenagh
Your path to submission
- Deadline: 2 October at 00:00 — 28 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In Ireland · Architecture & engineering, 271 contracts went to foreign companies over the last 3 years (of 4,523 recorded awards) — mostly from United Kingdom, Spain, France.
Typical field: median 4 (from 34 awards).
What the buyer is looking for
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project…
Show full description
… Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| John Ryan Construction Ltd | 35 | 2016–2024 |
| Rathcabin Tarmacadam Ltd | 20 | 2019–2026 |
| lazerline construction ltd | 17 | 2019–2024 |
| Glas Civil Engineering Ltd | 16 | 2016–2025 |
| Tony Kirwan Civil Engineering | 14 | 2017–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.