Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
Poland · 11 open tenders · 21 documented awards
Current tenders
Reviews, maintenance and operational services for electrical power equipment and installations at KOGENERACJA S.A. in EC Wrocław, EC Czechnica 2, EC Zawidawie, and at the fuel ash storage facility in Kamień
Deadline 26 Aug · 6 days left
Construction of a gas fuel cogeneration source based on a gas engine system for Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.
Deadline 28 Aug · 8 days left
Construction of generation sources based on gas and electrode water boilers for Wrocław Cogeneration Power Plants Team KOGENERACJA S.A.
Deadline 31 Aug · 11 days left
Construction of generation sources based on gas and electrode water boilers for Zespołu Elektrociepłowni Wrocławskich KOGENERACJA S.A.
Deadline 31 Aug · 11 days left
Comprehensive operation and maintenance of heat distribution assets (SMC) of KOGENERACJI S.A. in 2027-2029
Deadline 3 Sept · 14 days left
Inspections, maintenance and operational support services for electrical and power installation equipment and systems at KOGENERACJA S.A. in EC Wrocław, EC Czechnica 2, EC Zawidawie, and at the boiler ash waste storage facility in Kamień
Deadline 4 Sept · 15 days left
Maintenance and operation services for equipment at nodes: steam boiler room, water boiler room at Zespół Elektrociepłowni Wrocławskich KOGENERACJA Spółka Akcyjna
Deadline 9 Sept · 20 days left
Construction of new production units with a heat accumulator in EC Zawidawie
Deadline 10 Sept · 21 days left
Maintenance services for boiler room equipment at EC Czechnica 2 in Zespół Elektrociepłowni Wrocławskich KOGENERACJA Spółka Akcyjna
Deadline 17 Sept · 28 days left
Diagnostic and measurement services for equipment at the Wrocław Combined Heat and Power Plant Complex KOGENERACJA Joint Stock Company
Deadline 17 Sept · 28 days left
Purchasing rhythm
Awards per year — who knows the rhythm prepares before the notice appears.
202454
202561
202639
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ZEC SERVICE Sp. z o.o. | 5 | 2024–2025 |
| Zakłady Remontowe Energetyki Katowice S.A. | 3 | 2024–2025 |
| Instytut Automatyki Systemów Energetycznych Sp. z o.o. | 3 | 2024–2026 |
| Fabryka Wentylatorów FAWENT S.A. | 1 | 2025 |
| Grupa Powen-Wafapomp S.A. | 1 | 2025 |
| INTEC S.A. | 1 | 2025 |
| KSB Polska Sp. z o.o. | 1 | 2025 |
| MAGOTTEAUX S.A. | 1 | 2026 |
| OMC Envag Sp. z o.o. | 1 | 2025 |
| SwecO polska Sp. z o.o. | 1 | 2025 |
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.